Note: Before installing NE1032T and NE1072T RackSwitch with corresponding rail-kit into the rack cabinet,
tilt them slightly so that they can slide through the cabinet frame.
Figure 46. Tilting the switch to fit in the cabinet

Installing uninterruptible power systems (UPS)

See this section to learn how to install uninterruptible power systems (UPS).
Following the instructions in the following link to do removal, installation, or to update compatible software
for 5P1500R-L (120V) and 5P1550GR-L (230V).
https://www.eaton.com/us/en-us/catalog/backup-power-ups-surge-it-power-distribution/eaton-5p-
ups.resources.html