BRANNSTROM CleanTrack 1000 B Operation And Technical Manual

Oil discharge monitoring equipment
Hide thumbs Also See for CleanTrack 1000 B:
Table of Contents

Advertisement

Quick Links

Brannstrom Sweden AB
Uddevallagatan 14
416 70 Gothenburg, Sweden
Tel: +46 (0)31 195600
Fax: +46 (0)31 197790
Email: info@brannstrom.se
Operations and Technical manual for
Oil Discharge Monitoring Equipment
CleanTrack 1000 B
(Revision 2.20xd for Software version 2.20x)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CleanTrack 1000 B and is the answer not in the manual?

Questions and answers

Summary of Contents for BRANNSTROM CleanTrack 1000 B

  • Page 1 Brannstrom Sweden AB Uddevallagatan 14 416 70 Gothenburg, Sweden Tel: +46 (0)31 195600 Fax: +46 (0)31 197790 Email: info@brannstrom.se Operations and Technical manual for Oil Discharge Monitoring Equipment CleanTrack 1000 B (Revision 2.20xd for Software version 2.20x)
  • Page 2: Table Of Contents

    4.3.7. Piping for Air motor (Air motor option only) ..............20 4.4. Flow meter and Speed log ........................21 4.4.1. Flow meter general ......................21 4.4.2. BRANNSTROM standard flow transmitter............... 21 4.4.3. Speed log general ....................... 21 4.5. Paper Printer ............................22 4.6.
  • Page 3 9.8.4.4. Air motor Sample pump, Speck Y2951 9.8.5. Fuses ..........................94 9.9. Recommended Spare parts ........................95 9.10. Consumables ............................95 9.11. Storage before installation ........................95 10. Figures and Drawings ........................96 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 3 of 232...
  • Page 4 12.9. Sample Pump, Speck pump with Gast air motor ................228 13. Appendix, Work shop test and Calibration Certificate ..............229 14. Project specific drawings and data sheets ..................231 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 4 of 232...
  • Page 5: Introduction

    1. Introduction The Oil Discharge Monitoring System, CleanTrack 1000 B, has been designed to provide means of monitoring, recording and controlling the ballast discharge in accordance with the requirements in Resolution MEPC.108(49) as amended by Resolution MEPC.240(65) and is also approved for Bio- fuel blends in accordance with MEPC.1/Circ.761 as revised.
  • Page 6: Important Notes

    Brannstrom Sweden AB. 2.2. Disclaimer and Conditions All information provided by Brannstrom Sweden AB about this equipment is given in good faith and is based on the best knowledge available at the particular time. No responsibility is, however, assumed for possible inaccuracies or omissions.
  • Page 7: Updates In This Manual

    New “Declaration of Conformity”, issued 2019-01-02. Chapter 12.1. Declaration of Conformity page 166. 3. Specification 3.1. Description Type CleanTrack 1000 B Application Oil Discharge Monitoring and Control System for Oil Tankers in accordance with MEPC.108(49) as amended by Resolution MEPC.240(65), approved for Crude oils and Petroleum products as well as for 10 types of Bio-fuel blends in accordance with MEPC.1/Circ.761 as revised.
  • Page 8: Measuring Principle

    Signals from non-oil contaminants can be compensated for due to their different light scattering characteristics. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019...
  • Page 9: Scope Of Supply And System Supplies

    Voltage 85-265 VAC Frequency 50/60 Hz Consumption 30 W Ingress Protection IP42 Ambient Temp. 5 - 50 °C Weight ~7 kg Dimensions approx. 370 x 210 mm Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 9 of 232...
  • Page 10 If unit is powered through a frequency converter measurement might be faulty. For setting, see chapter 7.8.9. System Configuration, Alarms&Extras page 71. See also drawing CTB10003 sheet 4 of 4, Converting Unit page 103. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 10 of 232...
  • Page 11 See 4.c. below for more information about the Sample pump If sample temperature is higher than the ambient temperature limit the limit becomes lower or cabinet should be ventilated. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 11 of 232...
  • Page 12 See chapter 12.9. Sample Pump, Speck pump with Gast air motor page 228. If sample temperature is higher than the ambient temperature limit the limit becomes lower or cabinet should be ventilated. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019...
  • Page 13: Parts Always Included In The Analyzing Unit

    Measuring range 0-16 bar (any range 0-10 bar to 0-25 bar can be used) Sample connection G½” male thread Ex. Class must comply with the particular hazardous area Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 13 of 232...
  • Page 14: System Interfaces

    Interface for intrinsically safe communication between the Zener barrier and the Measuring cell. Interface for intrinsically safe flow meter only. Interface for intrinsically safe pressure transmitter only. Interface for intrinsically safe potential free contact. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 14 of 232...
  • Page 15: Installation

    4. Installation This chapter contains advice for the installation of CleanTrack 1000 B equipment on board tankers. The advice given in this chapter is of general validity and should be supplemented with a detailed installation specification for the particular ship. Additionally, all applicable regulations regarding the installation standard, issued by the relevant authorities and classification society must be followed.
  • Page 16: Converting Unit

    Keep Cb7 and other cables connected to intrinsically safe circuits separated from non-intrinsically safe circuit cables. Data communication between Converting Unit and Analyzing Unit, Cb7: Baudrate: 19200 baud. Length: ≤50 meters. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 16 of 232...
  • Page 17: Analyzing Unit

    CTB10010 sheet 3 of 5, Analyzing unit with air motor sample pump page 116. • CTB10010 sheet 5 of 5, Analyzing unit with air motor sample pump page 118. • Chapter 10.7. Connection box page 126 • Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 17 of 232...
  • Page 18: Inlet Probe And Outlet Stub

    The sample feed pump may be damaged if run dry for more than 10 seconds. The sample valves and sample inlet filter should be located with adequate space and accessibility for servicing. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019...
  • Page 19: Piping Of Sample Inlet And Outlet

    The water consumption is about 200 to 600 l/h and is open about 45 seconds at start-up. It is also recommended to flush manually at closing down. This makes about 6-20 liters per start/stop. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019...
  • Page 20: Piping For Air Motor (Air Motor Option Only)

    The calculation is for a straight pipe, pressure drops at bends has not been taken in account. Make own calculations and have margin to allow the pressure regulator to work properly. Pressure(final) = 5.2 bar (pipe inner diameter, [mm]) Initial pressure, [bar] Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 20 of 232...
  • Page 21: Flow Meter And Speed Log

    Refer to chapter 7.8.7. Speed page 70 for software programming. The speed log signal connected to CleanTrack 1000 B should be a pulse signal from a voltage free relay or switch. The pulse frequency should be proportional to the speed.
  • Page 22: Paper Printer

    Nominal flow of some sample pumps: Sample pump with Ex motor (SPP-100) 600 l/h Bulk head mounted (Nikuni or Matre): 900 l/h Sample pump with air driven motor: 240 l/h Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 22 of 232...
  • Page 23: First Start Up Checklist

    Converting Unit (Cb5), GPS input (Cb29) and Log input (Cb12) if speed log is used. Connect mains to the computer unit. After a few seconds 2 different “Brannstrom Sweden” will appear on the screen before the screen goes black again and about 2 minutes later the Cleantrack1000B software appears.
  • Page 24: Pressure Alarm Settings

    The limits for fresh water are however not essential the same way as the sample limits are. 13. When finished following the relevant steps in the 5.3. Close down procedure page 39. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 24 of 232...
  • Page 25: Zener Barrier Instructions And Replacement

    4.9. Zener Barrier Instructions and Replacement Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 25 of 232...
  • Page 26 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 26 of 232...
  • Page 27 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 27 of 232...
  • Page 28 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 28 of 232...
  • Page 29 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 29 of 232...
  • Page 30: Measuring Cell Instructions And Replacement

    4.10. Measuring Cell Instructions and Replacement Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 30 of 232...
  • Page 31 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 31 of 232...
  • Page 32 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 32 of 232...
  • Page 33: Measuring Cell Replacement (Ctb10032)

    4.10.1. Measuring Cell replacement (CTB10032) Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 33 of 232...
  • Page 34 Drawing: CTB10033 sheet 1, Measuring Cell assembly and connection. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 34 of 232...
  • Page 35 Drawing: CTB10036 sheet 1, Measuring Cell console hole pattern. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 35 of 232...
  • Page 36: Calculations On Intrinsically Safe Arrangements

    Also check the temperature class of installed intrinsically safe apparatus and if the specified zone is acceptable. Concerning cables to intrinsically safe equipment the writing in the standard, IEC 60079-14, is: Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019...
  • Page 37 200 pF/m and either 1 μH/m or 30 μH/Ω where the interconnection comprises two or three cores of a conventionally constructed cable (with or without screen).” Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 37 of 232...
  • Page 38: Start/Stop Procedure

    • Check that power is connected to the Converting unit. • If installed, check that the sample pump disconnector switch is ON. If the sample pump is powered by an air motor: Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 38 of 232...
  • Page 39: Close Down Procedure

    Carefully blow dry with air, make sure not to exceed the pressure ratings. For more details, see the DP transmitter maker’s instructions. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 39 of 232...
  • Page 40 Drain any part of the fresh water piping (if installed) which could be subjected to sub- zero temperatures. 13. The measuring cell can be disconnected and removed. If so, clean it, and store it in a dark, dry and temperature controlled location. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 40 of 232...
  • Page 41: Menu Operations

    Set LCD background light intensity. A press to the left gives a darker display and to the right a brighter display. Submenu select keys, described below. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 41 of 232...
  • Page 42: Edit Numeric Values

    The key can change the displayed menu, open a submenu, open a drop-down list or simply change color to yellow as an indication of activation. An example of a submenu is this verification menu which opens when the "Manual Override Discharge Valve" key is pressed: Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 42 of 232...
  • Page 43: Password

    The most commonly used passwords are the ones needed to enter sub menus from the “Main Menu” “Setup” – Password “3” and “Admin” • • “Computer” – Password “1” and “User” • “System check” – Password “2” and “Admin” Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 43 of 232...
  • Page 44: Measuring Cell - Indications And Keys

    "D1 Flashing SINGLE, D2 Flashing DOUBLE" - Waiting for KB to be pressed MC-D1 MC-D2 "D1 Flashing DOUBLE, D2 Flashing SINGLE" - Waiting for KA to be pressed MC-D1 MC-D2 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 44 of 232...
  • Page 45: Menu Layout

    7.1.1. Start page If the touch screen is inactive for more than about 30 minutes the “Start page” will be shown. Select “Continue” to go to the “Main Menu”. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 45 of 232...
  • Page 46: Operation

    Option for an “Extended” converting unit. A table showing sample pump motor data. “Show Motor” Option for an “Extended” converting unit. Showing the “Conv. Unit” table above. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 46 of 232...
  • Page 47: Running Settings

    Discharge line popup menu. (This popup menu will differ depending on selections made in Chapter 7.8.1. Line of discharge page 67) "#1", "#2", "#3" or “#4” Select line for discharging. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 47 of 232...
  • Page 48: Oil Type

    Oil types “Automotive Gasoline”, “Kerosene” and “Mar.Dist FO – DMA” are according to "White petroleum products" in MEPC.108(49). The bio-fuel blended types are in accordance with MEPC.1/Circ.761 and MEPC.240(65) and Annex 11 of MEPC.2/Circ.23. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 48 of 232...
  • Page 49 Bio-fuel blends of Kerosene and Alkanes (C10-C17), linear and branched C10-C17 (>75% but <99% Kerosene by volume) 1%-25% Alkanes Bio-fuel blends of Naphtha and Tert-Amyl ethyl ether Tert-Amyl ethyl ether (>75% but <99% Naphtha by volume) Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 49 of 232...
  • Page 50 No.4 Crude Oil Lubrication oil No.4 Crude Oil Heavy fuel oil No.6 Crude Oil Kerosene and JP1 jet fuel Kerosene Gasoline and JP4 type jet fuel Automotive Gasoline Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 50 of 232...
  • Page 51: Manual Override

    Display of the 1800 seconds (30 minutes) countdown timer that which automatically resets all of the 4 manual selections “Manual Oil conc”, “Manual Flow”, “Manual Speed” and “Manual Position” to automatic mode again. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 51 of 232...
  • Page 52: Status

    Only to be used in case of motor sensor malfunction. This selection needs to be verified on a popup window. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 52 of 232...
  • Page 53: Alarm Table

    Resetting alarms. Status columns indicates "ACTIVE" for alarm not yet resets and "RESET" for remaining alarms already reset. "Operate" Go to "Operate page". "MENU" Go to "Main Menu". Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 53 of 232...
  • Page 54: Recorded Data

    The indication (MaR) after “Conc” indicate that the Oil Concentration was set to manual after starting for discharge, (in “RUNNING” mode). Then the sample pump is started and normal pressure checks are made. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019...
  • Page 55: Recorded Data Examples

    Line 126751 show that overboard valve control is set back to automatic. Line 126752 show with the initial “\Alarm” the time that the alarm overboard valve in manual is deactivated. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 55 of 232...
  • Page 56: Usb

    (Most memory sticks are preformatted with FAT32) For information regarding Recorded data see chapter 7.4.1. Recorded data examples page 55. 7.5.1. USB-Memory stick Indications before a USB-Memory stick is inserted. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 56 of 232...
  • Page 57 If the USB-stick is removed before this key is pressed, power must be switched off and on again before the Computer Unit can recognize a USB-stick again. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 57 of 232...
  • Page 58: Save Printouts On Usb Stick

    7.5.2. Save Printouts on USB stick If the printer file “CTB-####_printer.txt” already exist on the USB-stick an overwrite verification popup is displayed. Select how many printouts to save on the USB-stick. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 58 of 232...
  • Page 59: On-Board Test

    An external malfunction can be checked by disconnecting power to the converting unit. Then communication alarms will be raised. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 59 of 232...
  • Page 60 30 liters per nautical mile; Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 60 of 232...
  • Page 61 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 61 of 232...
  • Page 62 The check should be made at a flow rate of about 50% of the rated flow of the flow meter. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019...
  • Page 63: Measuring Cell Check/Calibration

    Selection if the Zero Calibration Result is used in the concentration calculations. Graphs "Last Successful Zero" Displays the values from the last successful zero. "Is values" Displays the measured values. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 63 of 232...
  • Page 64: Zero Calibration Prepare

    Water Valve". If "No Controlled Water Valve" is selected in the Setup/Config-page this key is not visible. "Zero Prepare" Press this key to start preparations for Zero Check/Calibration. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 64 of 232...
  • Page 65: Zero Calibration Take Zero

    "Square indication" Indicates the result of the Check/Calibration, red = fail / green = ok. "Graph indication" See explanation 2 pages up when where Status is explained. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 65 of 232...
  • Page 66: Replace Measuring Cell

    The instructions on the 2 pages below describes how the Measuring Cell is replaced and the tools needed. Before replacing the measuring cell, study the chapter 4.10. Measuring Cell Instructions and Replacement page 30. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019...
  • Page 67: Setup Of Parameters

    Open a key in “Operate”-menu to manually control the slop tank valve output. Relay output on terminals 3 and 4 in computer unit controls the overboard valve. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 67 of 232...
  • Page 68: Zf1 (Zener Barrier Flow Input 1)

    "Square root" NO if current is linear to flow, YES if current is linear to pressure. 7.8.3. ZF2 Same as ZF1 above. 7.8.4. CVF Same as ZF1 above. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 68 of 232...
  • Page 69: Pressure

    “pressure increase”<“Water Low limit” for 10 seconds the “Alarm – Low Water Pressure” is activated. Any of these 2 alarms will stop the unit and close the water valve. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 69 of 232...
  • Page 70: Motor (Optional Extended Converting Unit I/O Pcb)

    Measured pulse frequency from the speed log. "Speed Log give" Speed log pulses per nautical mile. "Speed source" Selected speed source. "Log" speed pulse log, "GPS" speed from GPS. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 70 of 232...
  • Page 71: System Configuration, Standard

    An alarm for sample pump contactor feedback in wrong position will be raised again at every touch screen timeout (about 30 minutes). This alarm is always checked for units with serial number CTB 2892 and later. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 71 of 232...
  • Page 72 "$PCTB","Recorded data line","*",2 bytes checksum,Carriage Return,Line Feed. Baudrate=4800, Parity=None, Data bits=8. "Contact Information" Contact information can be displayed in the "Start menu" and in the "Alarm table". Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 72 of 232...
  • Page 73: Computer

    7.9.2. Real Time Clock Setting of the Real Time Clock. Clock shall be set to GMT-time. The clock can be set manually or to the time read from the GPS. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 73 of 232...
  • Page 74: Ip-Address

    If the calibration is successful the new calibration should be in effect directly after exit from the calibration screen. In some cases, the unit has to be restarted. Do this by disconnecting power and connecting it back on again. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019...
  • Page 75: System Check

    Press to activate. When activated, relay outputs of other printed circuit boards in the system can be manually activated. Take caution when starting the sample pump, pressure alarms are disabled. Password: "8378" and "Admin". Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 75 of 232...
  • Page 76: Gps (Nmea 0183 Receiver)

    Item d2 on drawing: CTB10001p sheet 3, Computer Unit with open door page 98. "PrinterCommStatus" Communication status with the paper printer module. "ActivateWinder" Activate the paper rewinder. "Print test line" Makes a test printout to the paper printer. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 76 of 232...
  • Page 77: Expiry (Trial Period)

    Relay outputs of the power supply "PowerFlags" Software version, temperature and flags status of the power supply. "PowerTxData" Transmit data to the power supply. "PowerRxData" Received data from the power supply. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 77 of 232...
  • Page 78: Cuio (Computer Unit I/O Pcb)

    "CVCT_In" Software version, digital inputs and current input of the CVCT PCB. "CVCT_TxData" Transmit data to the CVCT PCB. "CVCT_RxData" Received data from the CVCT PCB. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 78 of 232...
  • Page 79: Cvct/Extended (Optional Extended Converting Unit I/O Pcb)

    Software version, digital inputs ZD1 - ZD4, analogue input of channels ZP, ZF1 and ZF2. Voltage levels and temperature on the ZBCT PCB. "ZBCT_TxData" Transmit data to the ZBCT PCB. "ZBCT_RxData" Received data from the ZBCT PCB. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 79 of 232...
  • Page 80: Mc (Measuring Cell)

    Modbus RTU communication over an RS485 channel on the CUIO PCB in the Computer unit. Intended for communication with the Cargo Control system. This option is not further described in this manual. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019...
  • Page 81: Approvals

    If adaption for additional bio-fuels is needed, another serial number specific activation password can be purchased from an authorized agent. Select the “Upgrade” key and insert the activation password in the popup menu. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 81 of 232...
  • Page 82: Fault-Finding

    Alarm - Low Water Pressure Alarm - Overcurrent Alarm – High Pump Temperature Alarm - Indicating Flushing Water Alarm – Printer Busy Alarm – Printer Busy (Xoff) Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 82 of 232...
  • Page 83: System File Errors

    File system error indicating a compatibility error in “Valve Control” of “Line” data in the “Setup” menu. Settings “EL1/EL2” and “EL1/EL2-n” can only coexist together with “None”. Reprogram this setting or consult a service engineer for corrective actions. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 83 of 232...
  • Page 84: System Communications Errors

    Check the flat cable connections inside the Computer unit. "18 System - Replaced Measuring Cell?" If the Measuring Cell is replaced while power is connected to the Computer Unit, it will give this alarm. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 84 of 232...
  • Page 85: External Sensor Alarms

    The slop tank valve is controlled by the “EL2” relay output in the computer unit. Check the fuse(s) for the relay output the feedback connections. “29 Alarm - GPS Speed timeout” Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 85 of 232...
  • Page 86: Measurement Alarms

    Indicates a problem on the outlet side of the analyzing unit. “RUNNING” mode is stopped. See chapter 7.8.5. Pressure, page 69 and 7.8.8. System Configuration, Standard, page 71. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 86 of 232...
  • Page 87: Paper Printer Alarms

    Printer buffer has overflow. Printer busy do not work, check cable connections to the printer. If this alarm remains the printer and/or the CUIO PCB connected to the printer need to be replaced. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019...
  • Page 88: Extended Converting Unit Motor Alarms (Optional)

    The work pressure low limit is exceeded 5 seconds after the sample pump was stopped. A possible reason is that the sample pump is not stopped due to a malfunction in the sample pump control. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019...
  • Page 89 See chapter 7.8.9. System Configuration, Alarms&Extras page 71. Connect disconnector switch feedback to terminals 13, 14 on the Converting unit I/O pcb. Set the disconnector switch to “ON” when the unit is in use. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 89 of 232...
  • Page 90: Indications On Pcb's

    0.5 Hz Modbus Modbus Receive Transmit PCB located in the Converting unit, see CTB10003 sheet 3 of 4, Converting Unit page 102, d5. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 90 of 232...
  • Page 91: Extended Converting Unit I/O Pcb Indications (Optional)

    Measuring cell transmit Measuring Measuring cell cell receive comm. ok PCB located in the Converting unit, see CTB10003 sheet 3 of 4, Converting Unit page 102, d6. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 91 of 232...
  • Page 92: Maintenance, Spare Parts And Consumables

    If paper printer: check the amount of printer paper that is left and replace the roll if necessary, for safeguarding uninterrupted operation during next discharge. Consider to store “Recorded data” on a USB-memory stick. See chapter 7.5.1. USB-Memory stick page 56. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 92 of 232...
  • Page 93: Verification Of Accuracy And Access To Restricted Parts

    See chapter 8.1. Malfunction of Computer/Converting unit page 82. 9.5. Verification of accuracy and access to restricted parts User access to the Measuring cell is restricted with seals, which only Brannstrom Sweden AB can replace, in order to comply with clause 5.1 of MEPC. 108(49).
  • Page 94: Spare Parts

    Fuse F2, T1A, Subminiature 8.5mm Time-Lag T, 250VAC, Schurter 0034.6915 • Fuse F3, T1A, Subminiature 8.5mm Time-Lag T, 250VAC, Schurter 0034.6915 Fuse F4, T1A, Subminiature 8.5mm Time-Lag T, 250VAC, Schurter 0034.6915 • Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 94 of 232...
  • Page 95: Recommended Spare Parts

    Paper roll diameter: max 50 mm. Cleaning Brush Cleaning brush for CleanTrack 1000 B (cleaning of glass pipe in Measuring Cell). 9.11. Storage before installation Prior to installation the unit should be stored in a tempered and dry location protected from sunlight.
  • Page 96: Figures And Drawings

    This chapter contains standard drawing alternatives and options. For project specific drawings, refer to chapter 14. Project specific drawings and data sheet page 231. The rest of the page is intentionally left blank. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 96 of 232...
  • Page 97: Computer Unit

    10.1. Computer Unit Drawing: CTB10030 sheet 1, Computer Unit mounting Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 97 of 232...
  • Page 98 Drawing: CTB10001p sheet 3, Computer Unit with open door. Note: printer is optional. Standard version is without items d2 and d3. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 98 of 232...
  • Page 99 Drawing: P3715090 sheet 1, Computer Unit panel mount instructions. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 99 of 232...
  • Page 100: Converting Unit

    10.2. Converting Unit Drawing: CTB10003 sheet 1 of 4, Converting Unit. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 100 of 232...
  • Page 101 Drawing: CTB10003 sheet 2 of 4, Converting Unit. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 101 of 232...
  • Page 102 Drawing: CTB10003 sheet 3 of 4, Converting Unit. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 102 of 232...
  • Page 103 Drawing: CTB10003 sheet 4 of 4, Converting Unit. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 103 of 232...
  • Page 104: Analyzing Unit

    10.3. Analyzing Unit 10.3.1. Analyzing Unit skid with Ex. motor Sample pump Drawing: CTB10015 sheet 1 of 3, Analyzing unit skid with electrical Ex. motor sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 104 of 232...
  • Page 105 Drawing: CTB10015 sheet 2 of 3, Analyzing unit skid with electrical Ex. motor sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 105 of 232...
  • Page 106 Drawing: CTB10015 sheet 3 of 3, Analyzing unit skid with electrical Ex. motor sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 106 of 232...
  • Page 107: Analyzing Unit With External Sample Pump

    10.3.2. Analyzing Unit with external Sample pump Drawing: CTB10014 sheet 1 of 5, Analyzing unit with external sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 107 of 232...
  • Page 108 Drawing: CTB10014 sheet 2 of 5, Analyzing unit with external sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 108 of 232...
  • Page 109 Drawing: CTB10014 sheet 3 of 5, Analyzing unit with external sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 109 of 232...
  • Page 110 Drawing: CTB10014 sheet 4 of 5, Analyzing unit with external sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 110 of 232...
  • Page 111 Drawing: CTB10014 sheet 5 of 5, Analyzing unit with external sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 111 of 232...
  • Page 112: Analyzing Unit With Freestanding Items For External Sample Pump

    10.3.3. Analyzing Unit with Freestanding items for External Sample pump Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 112 of 232...
  • Page 113 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 113 of 232...
  • Page 114: Analyzing Unit With Air Motor Sample Pump

    10.3.4. Analyzing Unit with Air motor Sample pump Drawing: CTB10010 sheet 1 of 5, Analyzing unit with air motor sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 114 of 232...
  • Page 115 Drawing: CTB10010 sheet 2 of 5, Analyzing unit with air motor sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 115 of 232...
  • Page 116 Drawing: CTB10010 sheet 3 of 5, Analyzing unit with air motor sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 116 of 232...
  • Page 117 Drawing: CTB10010 sheet 4 of 5, Analyzing unit with air motor sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 117 of 232...
  • Page 118 Drawing: CTB10010 sheet 5 of 5, Analyzing unit with air motor sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 118 of 232...
  • Page 119: Sample Pump With Ex. Motor

    10.4. SPP-100 Sample pump with Ex. Motor Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 119 of 232...
  • Page 120 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 120 of 232...
  • Page 121: Nikuni Sample Pump For Bulkhead Mounting

    10.5. Nikuni Sample pump for Bulkhead mounting Drawing: CT041029.1, Nikuni Bulkhead Sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 121 of 232...
  • Page 122 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 122 of 232...
  • Page 123 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 123 of 232...
  • Page 124: Matre Sample Pump For Bulkhead Mounting

    10.6. Matre Sample pump for Bulkhead mounting Drawing: CT891211.1, Matre Bulkhead Sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 124 of 232...
  • Page 125 Drawing: CT900907.1, Matre Bulkhead Sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 125 of 232...
  • Page 126: Connection Box

    10.7. Connection box Drawing: CTB10021 sheet 1 of 2, Connection box. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 126 of 232...
  • Page 127 Drawing: CTB10021 sheet 2 of 2, Connection box Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 127 of 232...
  • Page 128: Measuring Cell Replacement

    10.8. Measuring Cell replacement Drawing: CTB10032 sheet 1 of 1, Measuring Cell replacement. For replacement instructions, see chapter 4.10. Measuring Cell Instructions and Replacement page 30. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 128 of 232...
  • Page 129: Ga-Plans

    10.9. GA-plans 10.9.1. Partnames of typical arrangement Drawing: CTB10601 sheet 1 of 1, Partnames of typical arrangement. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 129 of 232...
  • Page 130: Ga-Plan With Ex. Motor Sample Pump

    10.9.2. GA-plan with Ex. motor Sample pump Drawing: CTB10907 sheet 1 of 1, GA-plan with skid Ex. motor sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 130 of 232...
  • Page 131 Drawing: CTB10917 sheet 1 of 1, GA-plan with skid Ex. motor sample pump and flushing. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 131 of 232...
  • Page 132 Drawing: CTB10908 sheet 1of 1, GA plan with free standing Ex. Motor sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 132 of 232...
  • Page 133: Ga-Plan With Bulkhead Penetrating Sample Pump

    10.9.3. GA-plan with bulkhead penetrating Sample pump Drawing: CTB10906 sheet 1 of 1, GA-plan with bulkhead penetrating Sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 133 of 232...
  • Page 134 Drawing: CTB10916 sheet 1 of 1, GA-plan with bulkhead penetrating Sample pump and flushing. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 134 of 232...
  • Page 135: Ga-Plan With Air Motor Sample Pump

    10.9.4. GA-plan with Air motor Sample pump Drawing: CTB10901 sheet 1 of 1, GA-plan with air motor sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 135 of 232...
  • Page 136 Drawing: CTB10911 sheet 1 of 1, GA-plan with air motor Sample pump and flushing. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 136 of 232...
  • Page 137: Ga-Plan With Pilot Controlled Air Motor Sample Pump

    10.9.5. GA-plan with pilot-controlled Air motor Sample pump Drawing: CTB10903 sheet 1 of 1, GA-plan with pilot-controlled air motor sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 137 of 232...
  • Page 138: Electrical

    10.10. Electrical 10.10.1. Electrical cable diagram for electrical Ex. motor sample pump Drawing: CTB110204.1el, electrical cable diagram for electrical Ex. motor sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 138 of 232...
  • Page 139: Electrical Cable Diagram For Bulkhead Mounted Sample Pump

    10.10.2. Electrical cable diagram for bulkhead mounted sample pump Drawing: CTB110204.1bh, electrical cable diagram for bulkhead mounted sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 139 of 232...
  • Page 140: Electrical Cable Diagram For Air Motor Sample Pump

    10.10.3. Electrical cable diagram for air motor sample pump Drawing: CTB110204.1pn, electrical cable diagram for air motor sample pump. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 140 of 232...
  • Page 141: Internal Cable Diagram For Electrical Sample Pump Motor

    10.10.4. Internal cable diagram for electrical sample pump motor Drawing: CTB110627.1el, internal cable diagram for electrical sample pump motor. Include wires 008 and 009 for sample pump contactor feedback. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 141 of 232...
  • Page 142: Internal Cable Diagram For Extended Spp-100 Sample Pump Motor (Optional)

    10.10.5. Internal cable diagram for Extended SPP-100 sample pump motor (Optional) Drawing: CTB110627.1elext, internal cable diagram for optional extended SPP-100 sample pump motor Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 142 of 232...
  • Page 143: Sample Probes

    10.11. Sample probes 10.11.1. Sample probes installation arrangements 1” Drawing: CTB891216.1, Sample probes installation arrangements 1”. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 143 of 232...
  • Page 144 Drawing: CTB900105.4, Sample probes valve arrangements 1”. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 144 of 232...
  • Page 145: Flow Meter

    10.12. Flow meter Drawing: CT891215.5, CleanTrack Flow meter unit, Vertical. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 145 of 232...
  • Page 146 Drawing: CT900503.1, CleanTrack Flow meter unit, Horizontal. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 146 of 232...
  • Page 147 Drawing: CT050505.1, CleanTrack Flow transmitter bracket. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 147 of 232...
  • Page 148: Approval Certificates

    11. Approval Certificates 11.1. Certificate: MED-D Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 148 of 232...
  • Page 149 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 149 of 232...
  • Page 150: Type Approval, Dnv

    11.2. Type Approval, DNV Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 150 of 232...
  • Page 151 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 151 of 232...
  • Page 152 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 152 of 232...
  • Page 153 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 153 of 232...
  • Page 154: Type Approval, Germany

    11.3. Type Approval, Germany Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 154 of 232...
  • Page 155 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 155 of 232...
  • Page 156 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 156 of 232...
  • Page 157 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 157 of 232...
  • Page 158: Imo Certificate, Ccs

    11.4. IMO Certificate, CCS Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 158 of 232...
  • Page 159 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 159 of 232...
  • Page 160: Type Approval, Ccs

    11.5. Type Approval, CCS Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 160 of 232...
  • Page 161 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 161 of 232...
  • Page 162 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 162 of 232...
  • Page 163: Type Approval, Nk

    11.6. Type Approval, NK Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 163 of 232...
  • Page 164: Type Approval, Rmrs

    11.7. Type Approval, RMRS Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 164 of 232...
  • Page 165 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 165 of 232...
  • Page 166: Atex Certificates And Instructions

    12. ATEX Certificates and Instructions 12.1. Declaration of Conformity Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 166 of 232...
  • Page 167 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 167 of 232...
  • Page 168 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 168 of 232...
  • Page 169: Atex Certificate Zener Barrier Pcb

    12.2. ATEX Certificate Zener Barrier PCB Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 169 of 232...
  • Page 170 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 170 of 232...
  • Page 171 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 171 of 232...
  • Page 172 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 172 of 232...
  • Page 173 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 173 of 232...
  • Page 174: Atex Certificate Measuring Cell

    12.3. ATEX Certificate Measuring Cell Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 174 of 232...
  • Page 175 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 175 of 232...
  • Page 176 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 176 of 232...
  • Page 177 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 177 of 232...
  • Page 178: Pressure Transmitter, Danfoss

    12.4. Pressure transmitter, Danfoss Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 178 of 232...
  • Page 179 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 179 of 232...
  • Page 180 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 180 of 232...
  • Page 181 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 181 of 232...
  • Page 182 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 182 of 232...
  • Page 183 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 183 of 232...
  • Page 184 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 184 of 232...
  • Page 185: Pressure Transmitter, Siemens

    12.5. Pressure transmitter, Siemens 12.5.1. Declaration of Conformity Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 185 of 232...
  • Page 186 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 186 of 232...
  • Page 187: Atex Certificate

    12.5.2. ATEX Certificate Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 187 of 232...
  • Page 188 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 188 of 232...
  • Page 189 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 189 of 232...
  • Page 190: Flow Meter, Siemens

    12.6. Flow meter, Siemens Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 190 of 232...
  • Page 191 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 191 of 232...
  • Page 192 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 192 of 232...
  • Page 193 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 193 of 232...
  • Page 194 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 194 of 232...
  • Page 195 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 195 of 232...
  • Page 196 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 196 of 232...
  • Page 197 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 197 of 232...
  • Page 198: Flow Meter, Fuji

    12.7. Flow meter, Fuji Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 198 of 232...
  • Page 199 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 199 of 232...
  • Page 200 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 200 of 232...
  • Page 201: Sample Pump, Spp-100 With Elprom Explosion Proof Motor

    12.8. Sample Pump, SPP-100 with Elprom explosion proof motor 12.8.1. Elprom instructions Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 201 of 232...
  • Page 202 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 202 of 232...
  • Page 203 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 203 of 232...
  • Page 204 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 204 of 232...
  • Page 205: Elprom Certificate, Ept 17 Atex 2588 X

    12.8.2. Elprom Certificate, EPT 17 ATEX 2588 X Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 205 of 232...
  • Page 206 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 206 of 232...
  • Page 207 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 207 of 232...
  • Page 208 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 208 of 232...
  • Page 209: Elprom Certificate, Eum1 10 Atex 0350

    12.8.3. Elprom Certificate, EUM1 10 ATEX 0350 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 209 of 232...
  • Page 210 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 210 of 232...
  • Page 211 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 211 of 232...
  • Page 212 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 212 of 232...
  • Page 213 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 213 of 232...
  • Page 214 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 214 of 232...
  • Page 215 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 215 of 232...
  • Page 216 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 216 of 232...
  • Page 217 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 217 of 232...
  • Page 218 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 218 of 232...
  • Page 219 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 219 of 232...
  • Page 220 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 220 of 232...
  • Page 221 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 221 of 232...
  • Page 222 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 222 of 232...
  • Page 223 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 223 of 232...
  • Page 224 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 224 of 232...
  • Page 225 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 225 of 232...
  • Page 226: Hummel Cable Gland Certificate, Dekra 12Atex0139 X

    12.8.4. Hummel Cable Gland Certificate, DEKRA 12ATEX0139 X Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 226 of 232...
  • Page 227 Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 227 of 232...
  • Page 228: Sample Pump, Speck Pump With Gast Air Motor

    12.9. Sample Pump, Speck pump with Gast air motor Please contact Brannstrom Sweden AB to receive the ATEX certificate of the Speck sample pump with Gast air motor. Email: info@brannstrom.se Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 228 of 232...
  • Page 229: Appendix, Work Shop Test And Calibration Certificate

    13. Appendix, Work shop test and Calibration Certificate The 4 following pages contains: Work shop test: 4 pages Calibration Certificate: 1 page Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 229 of 232...
  • Page 230 This page is intentionally left blank. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 230 of 232...
  • Page 231: Project Specific Drawings And Data Sheets

    14. Project specific drawings and data sheets Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 231 of 232...
  • Page 232 This page is intentionally left blank. Brannstrom Sweden AB CleanTrack 1000B - Rev 2.20xd, 2019 Page 232 of 232...

Table of Contents

Save PDF