Instructions Operating Manual Series X 90 Point Level Monitors Programmable Microprocessor POINT LEVEL MONITORS SERIES X90 Instructions and Operating Manual Customer’s Name ________________________ Customer’s P.O. No. ______________________ Ronan Job No. ___________________________ 012208...
Using the Leak Test Kit……………..................12.2 Warranty Ronan warrants equipment of its own manufacture to be free from defects in material and workmanship under normal conditions of use and service, and will repair or replace any component found to be defective, on its return, transportation charges prepaid, within one year of its original pur- chase.
1.0 GENERAL DESCRIPTION Ronan, contact Ronan Engineering for detailed shipping instructions. The Ronan Series X90 Point Level Monitor economically A Geiger-Mueller tube is used as the sensor for and reliably solves many process problems in which detecting the gamma radiation. The G-M tube consists of noise, temperature, abrasive or corrosive conditions a gas-filled cylinder with a central anode.
T h e R o n a n Remote Probe (located on vessel) with the X90-301 The Ronan Series X90 gamma switches provide an switch electronics may be located in a general alarm signal whenever the radiation field intensity at the detector changes by more than its predetermined value.
Any access. discrepancies between shipping contents and invoice Not Used should be immediately reported to Ronan or the Ronan representative. Level Alarm Mode: All Series X90 system components (source holder, On=High Level/Off= Low...
out” the incoming counts to the processor module, in Status Normal Fail Level Fail Alarm Rem. Relay Relay this way producing zero counts in. It is intended to be used only when the gage is in a Reference condi- tion; I.e.: empty vessel with the source open. Normal Level With the switch type set to Low Alarm and in the Ref-...
Ronan Engineering suggests that a detected radiation indicates a change in process voltmeter with a resistance of at least 20 kohm/V be used for measurement of voltages.
In the majority of Ronan installations, the source is padlocks on all man-way and access port covers is contained in a lead-filled source holder with an ON/OFF acceptable. The key or combination for the locks should mechanism. The holder is designed so that the radiation be kept by the person responsible for radiation safety.
Page 9
Figure 2: Radiation Transmission CS-137 for Various Materials 012208...
An NRC-approved label is attached to the inches of the vessel. He would receive a dose source holder by Ronan Engineering prior to in excess of 100 mr. He would then require a shipment. For sources in source wells, and NRC- monitoring device.
0.5 rem/yr. padlock. d) Remove extender rod. The gage is shipped from the Ronan factory with e) Remove handle from extender rod and attach to the source holder locked OFF. The combination ill source rod.
There may be some slight resistance to movement In addition to notifying the NRC or the agreement due to bearing friction. state agency, Ronan Engineering should also be notified, so that proper help can be provided. Do not force the handle.
Leak test forms. the source; and the results of the test expressed in microcuries. After the sealed sources have been wiped by the customer, the kit is to be returned to Ronan for analysis. Ronan will analyze...