Installation procedure

Symbols and their meanings
Visual confirmation required.
Horizontal
Horizontal confirmation
required.
Mark
Mark the location.
Drill a 3-3/4"(95mm) hole on the
subfloor 1-3/4" (45mm) from the
front of studs.
1-3/4"(45mm)
Loosen the bolts on the adjustable
legs and adjust the carrier to the
desired height with reference to
the Finished Floor (see Table 1
for guide).
Place the carrier so that the front
of the carrier frame is flush with
the front of the supporting wall
frame.
Tighten the two bolts on the
legs to secure the height of the
carrier.
INSTALLATION PROCEDURE
1. Install the discharge pipe
2. Adjust the tank legs
FFL
Seal
Attach sealing tape
Vertical
Vertical confirmation
required.
39-3/8"
(1000mm)
5