Installation - Chaffoteaux & Maury Bayard 10 CFPV Manual

Table of Contents

Advertisement

'
.....
QI
QI
L
V\
"' .....
"'
0
-�
.....
L
-
0
-�
QI
.....
L
0
0
>,
V
::,
"'
V
V
QI
.....
L
-
C
QI
"' .....
-�
?
GAS VALVE AND WATER SECTION ASSEMBLY
:g
REMOVAL{Fig.4)
C
1. Turn off the gas and water supplies.
g_
2. Remove front case and drain the unit (S).
3. Unscrew the pilot supply pipe retention
0
'
2
bracket and remove pipe and bracket ( 12).
;;­
4. Unscrew the burner manifold retention
c
QI
E
screws and lift off the manifold (11).
"'
a.
0
QI
V
·�
THE APPLIANCE SHALL ONLY BE CONVERTED TO A GAS FOR WHICH IT HAS BEEN APPROVED
QI
"' T.G. & T.L.P. to N.G.
g REFER TO REPLACEMENT PART S FOR N.G.
> SUBSTITUTES.
0
1. Remove the front case.
C
2. Remove pilot bracket and pilot supply pipe.
.2
..... "'
3. Fit N.G. pilot injector.
a.
4. Remove the two screws from the burner
0
manifold and withdraw the manifold.
V
QI
::,
u.
o1!
.,, "'
THE APPLIANCE SHALL BE INSTALLED ACCORDING TO THE MANUFACTURERS INSTRUCTIONS AND ALL
\.'.)
QI
RELEVANT STATUTORY REGULATIONS AND CODES OF PRACTICE .
.....
..c
"
>,
.D
LOCATION
QI
Where a unit is to be fitted to a combustible wall
-�
L
15
surface the wall must be protected by a non -
::,
a..
combustible panel. The rear of the unit has a
retention slot designed for the wall bracket,
which is packed with the appliance (Item 7
replacement parts). The wall bracket is attached to
the wall by a single fixing screw.
BAYARD 10 CFPV & 13 CFPV
MAINTENANCE Cont'd.
1.
2.
3.
4.
5.
6.
7.
8.
9
10 .
11.
12.
13.
GAS AND WATER SECTIONS (Fig. 4)
5. Disconnect the two inlet and two outlet
6. Disconnect the gas supply connection.
7. Ease the complete assembly downwards and
8. On reassembly, test for water leaks and gas
CONVERSION
5. Fit N.G. burner injectors or the complete
6. Unscrew the gas governor from top of gas
7. Reassemble and set the correct gas pressure.
8. Amend the label.
9. Test for gas escapes on completion.

INSTALLATION

Position the bracket on the wall so that the
distance between the fixing screw and the centre
of the water inlet pipe is 496 mm for the 10 CFPV
model and S 17mm for the 13 CFPV model.
FLUE CONNECTION
10 CFPV 110mm nominal
13 CFPV 125mm nominal
.,.
Gas inlet pressure test point
Cold water inlet connection
riedLed water outlet 1..un,kction
Slow ignition adjustment
Water regulator & drain
Water flow control spindle
Water section
Gas section
Piezo assembly
Operating cam
Burner manifold
Pilot supply pipe
Gas regulation adjustment
water connections from the water section.
lift away.
escapes.
N.G. manifold.
section and replace gas float with N.G. float .
-
-
'
,....-
l
,
I
l
:...
-�
-
.
Page3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bayard 13 cfpv

Table of Contents