Pioneer PDK-TS03 Operating Instructions Manual page 13

Table top stand
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 11
As shown in figure, hook the stand pipe holes (either pipe A or B) onto the screw heads
Step 2.
of the installation bolts 1, then slide the stand upwards to the main plasma display until
it engages the installation bolts 1 (once put together with the display, the stand will
slides no more than 19 mm (3/4 inch)).
Pass the installation bolts 2 (M8 x 40) through the stand pipes and tighten the installa-
Step 3.
tion bolts securely with the included hexagonal wrench (The holes shpuld be used in the
proper combinations, A–A' and B–B').
Using the hexagonal wrench provided, tighten the installation bolts 1 that were inserted
Step 4.
in Step 1.
Table top stand
Step 5.
Installing the Product on a Rack, etc.
Step 6.
After installing the stand, remove the rotation-preventing bolts from the holes for pre-
venting the equipment from falling over.
These bolts are to prevent deviations in rotation from occurring during transport. The
stand could break if it is rotated excessively with the bolts still in place.
Installation bolts 2 (M8 x 40) (Step 3)
Sheet
Rotation-preventing bolts
Slide the stand (Step 2)
13

Advertisement

Table of Contents
loading

Table of Contents