Replacement Of Insulators; Hollow Insulators With Arcing Chamber. Fig; Insulator For Fuse-Base And Quick Make Earthing Switch - ABB NAL Series Installation And Operating Instructions Manual

Indoor air switch-disconnector
Hide thumbs Also See for NAL Series:
Table of Contents

Advertisement

20.0 Replacement of insulators

1
2
A
B
C
D
15 [Nm]
(standard DMC
and epoxy insulators)
E
F
G
113 Tightening torque for screws NAL/VR 12/17,5/24
1
A
H
Standard Tolerances for Machining and Forming
PROPRIETARY AND SECRET INFORMATION
Coord. punching N.C.Mach.
and unfold JS11
The information contained in this document has to be kept strictly confidential.
Any unauthorized use, reproduction, distribution or disclosure to third parties
X
f
m
c
v
is strictly forbidden. ABB reserves all rights regarding Intellectual Property Rights.
ISO 2768 T.1 Lengths and Angle
Thread Quality Tolerance
X
"6g-6H" ISO 965
ISO 2768 T.2 Geometrical Tolerances
H
K
L
© Copyright
2016
ABB. All rights reserved.
1
2
B
C
15 Nm
D
1
114 Tightening torque for screws NAL/VR 12/17,5/24
A
E
B
1
C
15 Nm
E
115 Support insulators
F
G
3
4
5
6
15 [Nm]
(DMC insulators
with inserts)
40 [Nm]
+
D
2
3
4
15 Nm
3
4
5
6
2
3
4
Material
Surface code
Type
Revision
4.2
Drawn
Checked
Approved
2
3
4
4.1
4.3
7
8
9
10

20.1 Hollow insulators with arcing chamber. Fig.

113
_
WARNING!
These operations shall be carried out by
authorised ABB service only!
1.
Unscrew 3.9 and detach the insulator.
2.
Attach the new insulator to the frame by the
two self-tapping screws in case of DMC
/
10%
(BMC) insulators or standard metric screws
-
in case of epoxy insulators. Remember to
5
6
7
8
mount the piston with piston rod 3.10. For
Material
Surface code
Type
Derived from
Drawing status
Marketing documentation
correct torque see Fig. 114.Note the washer
Revision
EC No.
Responsible
Title
PLABB
Post insulator with contact knife
Location
Date
Name
complete NAL 17,5/24kV 630A
Drawn
PL-PSY
2019-08-27
C. Nożyński
Subtitle
PL-PSY
2019-08-27
A. Sypniewski
NAL
Checked
and spring washer for the screws.
Approved
PL-PSY
2019-08-27
P. Spalitabaka
ABB Switzerland Ltd
Drawing No.
1YMX000271M0136
Group Technology Management
7
8
9
10
20.2 Insulator for fuse-base and quick make
15 Nm
earthing switch
_
WARNING!
5
These operations shall be carried out by
authorised ABB service only!
A
Weight
Surface
Derived from
Drawing status
EC No.
Responsible
Title
PLABB
Location
Date
Name
PL-PSY
M. Mańkowski
1.
Unscrew 4.2 and detach the fuse clips and
Subtitle
ABB Switzerland Ltd
Drawing No.
contact block respectively.
Group Technology Management
5
6
7
B
8
2.
Unscrew 4.3 at the base of the insulator and
detach the insulator.
3.
Attach the new insulator to the frame by the
C
two self-tapping screws in case of DMC
(BMC) insulators or standard metric screws
in case of epoxy insulators 4.3. For correct
15 Nm
torque see Fig. 115. Note the washer and
D
spring washer for the screws.
4.
Attach the fuse clips and contact block
respectively to the top of the insulator by the
screws 4.2. For correct torque see Fig. 115
F
G
11
A
B
C
D
E
F
G
Weight
Surface
A
Scale
1:2
Language
H
EN
Format
A2
Sheet No.
1 / 1
11
B
C
D
E
Scale
1:3
Language
EN
Format
A3
Sheet No.
1 / 1
57
D

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nalf seriesVr series

Table of Contents