Download Print this page

Centroid MPU11 Installation Manual

Mill kit installation

Advertisement

Quick Links

MPU11/ GPIO4D Mill Kit Installation
Rev1 Last revised 2010-06-28 (188)

Advertisement

loading

Summary of Contents for Centroid MPU11

  • Page 1 MPU11/ GPIO4D Mill Kit Installation Rev1 Last revised 2010-06-28 (188)
  • Page 2: Table Of Contents

    Table of Contents 1. Introduction 2. I just received my kit 3. Desk/Bench top connection & Install 1. Software Install 4. Panel Layout 5. 58788 6. 8888 7. Basic Sub system wiring 8. 000 9. Wiring Auxillary Sub Systems. a) Lube Pump...
  • Page 3: Introduction

    A troubleshooting procedure is included for each section of the installation so that if you do run into any problems, you will be able to quickly isolate the cause and correct it, if more information is needed please use the Centroid dealer support site at: http://www.centroidcnc.com/dealersupport/index.php to review all schematics, tech bulletins and other information you can use to set up your control.
  • Page 4: I Just Received My Kit

    Now is the time to make sure your kit is complete and has not been visibly damaged in shipment. If you ordered the basic kit, you should have received: The Centroid Based CNC Kit you purchased contains, the following and can be seen in Figure # 2. 1. GP4IOD 3 party drive interface with integrated PLC 1 ea.
  • Page 5: Desk/Bench Top Connection & Install

    Before you install the software connect your power supply, GPIO4D, and your MPU11 to your PC,as shown in Figure 3. You will need a RJ45 cable to connect your PC and MPU11 as shown in Figure 4 and 5, (This cable is not included in your kit.).
  • Page 6 Now connect you the Fiber optic cables from the MPU11 (Figure 5) to the GPIO4D (Figure 6). Fibers are connected straight thru. So fiber 1 goes to fiber 1 on both the MPU11 and GPIO4D, and 3 to 3 and are color coded. Blue to blue and gray to gray.
  • Page 7 And one DC Power supply to the GPIO4D. FIG.8 You are now ready to plug in your power cords to the MPU11 and GPIO4D power supplies to the power strip. Make sure that they are both powered up before you run the software.
  • Page 8: Software Install

    2.If you are running from the DVD, double click “setup.exe” in the “Centroid CNC11 Software” directory to begin the software installation. (If you downloaded the software from the website, extract the files to a local directory and then double click “setup.exe”)
  • Page 9 Windows firewall to allow CNC11 access to the network to communicate with the MPU11 hardware. 1. Configuring your network adaptor: a) Click on the Windows logo in the bottom left corner of your desktop. b) Type “network and sharing” into the “Search programs and files”...
  • Page 10 “Properties” c) Check “Run as administrator” box, click “OK” to complete step 2. 3. Configuring Windows Firewall To Allow CNC11 to Communicate With The MPU11. Double click the CNC11 icon to start the software. When the “User Account Control” window is displayed, click “Yes”...
  • Page 11: Panel Layout

    4. Apply power to the MPU11 and power up the PC, once in Windows click on your CNC11 icon to run the software. If everything is communicating correctly it should load into the software and be waiting to be configured.
  • Page 12 Start the CNC11 software by double clicking on the CNC11 Mill icon on your desktop. After the MPU11 has initialized, press F10 to continue to the main screen. Now, hold down the “alt” key and press the “i” key at the same time to bring up the real-time I/O display.
  • Page 13 Estop PLC input wiring The Estop input (input 11) on the GPIO4D must be wired to a normally closed switch (contact closure). When the Estop input is open, the motors are disabled. E-stop wiring no pendant E-Stop Switch GPIO4D IN COMMON 9-12 E-STOP IN11 12VDC POWER SUPPLY...
  • Page 14 This method is the best for reliable even lubing of your machine. Centroid Users see Tech Bulletin #171 and Parameter 179 in the operators manual for further explanation.

This manual is also suitable for:

Gpio4d