Download Print this page
Natural Bed Company Orchid Four Poster Bed Assembly Instructions

Natural Bed Company Orchid Four Poster Bed Assembly Instructions

Single (.90x1.90)

Advertisement

Quick Links

Natural Bed Company
Orchid Four Poster Bed Assembly Instructions
Items included in bed flat pack are:
1 x headboard
1 x footboard
4 x extension posts
4 x canopy beams
2 x side rails
1 x set of sprung beech slats
1 x set of double sprung beech slats with sliders
1 x set of plastic end caps (2 per slat)
Fixings:
8x threaded bolts
4x nuts
8x wooden dowels
4x bronze bolts
1. Place the wooden dowels in the outer holes at the ends of the side rails, tap
these in securely. (See images below)
2. Screw the four threaded bolts into the middle holes of the legs of the
headboard and footboard panels. (See images below)
168-170 Devonshire Street, Sheffield, S3 7SG. T: 0114 272 1984
counter@naturalbedcompany.co.uk
Single (.90x1.90)
View the Orchid on our website
4x half-moon washers
1x spanner
1x hexagon key for bronze bolts
www.naturalbedcompany.co.uk

Advertisement

loading

Summary of Contents for Natural Bed Company Orchid Four Poster Bed

  • Page 1 Natural Bed Company Orchid Four Poster Bed Assembly Instructions Single (.90x1.90) View the Orchid on our website Items included in bed flat pack are: 1 x headboard 1 x footboard 4 x extension posts 4 x canopy beams 2 x side rails...
  • Page 2 Natural Bed Company 3. Attach the side rails to the footboard legs (see images on the previous page), then loosely secure using the half-moon washer and the nut with the spanner provided (see image below). In the same way attach the side rails to the headboard to create a full bed frame.
  • Page 3 – see image below. Slats 4-9 will be double slats, the others are standard single slats (see image below). We hope you enjoy your Natural Bed Company Bed! 168-170 Devonshire Street, Sheffield, S3 7SG. T: 0114 272 1984 counter@naturalbedcompany.co.uk...