Switching power generator with embedded microcontroller for 3 kw magnetron (30 pages)
Summary of Contents for ALTER FX 950 T
Page 1
FX 950 T POWER SUPPLY UNIT FOR 3 KW MAGNETRON TECHNICAL NOTE (Issue April 2004)
Page 2
I Prodotti sopraindicati sono conformi con la Direttiva di Bassa Tensione 73/23/EEC Reggio Emilia, Aprile 2004. Marco Garuti Presidente C.d.A. Rev. Note di revisione Data File Prima emissione Aprile 2004 FX950T_r0eng page 1 of 8 File: FX950T_r0eng - April 2004 - Technical note: FX 950 T...
Page 3
The generator, if correctly installed, is in compliance with the expected FX 950 T has two (F1 and F2) fuses assembled on radio noise limits for Group 2, Class A equipment the control card and one (F3) fuse assembled on the provided by the EN 55011 regulation.
Failure to comply with these instructions is dangerous for those who use the equipment, apart from the possibility to cause equipment breakdowns. page 4 of 8 File: FX950T_r0eng - April 2004 - Technical note: FX 950 T...
Page 6
5 second minimum both for ON and OFF. Always open the external switch before replacing the fuse or making connections to the power supply unit. page 5 of 8 File: FX950T_r0eng - April 2004 - Technical note: FX 950 T...
Page 7
Caution: it is compulsory to connect the earth screw of the head to the earth screw of the power supply unit: failure to do this may cause a death risk page 6 of 8 File: FX950T_r0eng - April 2004 - Technical note: FX 950 T...
Page 8
FX 950 T EXTERNAL WIRING DIAGRAM page 7 of 8 File: FX950T_r0eng - April 2004 - Technical note: FX 950 T...
Web: www.altersystem.com moment and without prior notice. This publication cannot be reproduced without the written consent of Alter. All rights are reserved. page 8 of 8 File: FX950T_r0eng - April 2004 - Technical note: FX 950 T...
Need help?
Do you have a question about the FX 950 T and is the answer not in the manual?
Questions and answers