Page 2
Description Description The Ventilation Controls TH PF(-U) combine sensor system and control technology for the ventilation system. Temperature and humidity of the air are monitored. The device controls a window (open/close in one or two steps) or a ventilation device (one or two levels) via potential-free outputs.
Elsner Elektronik is not liable for any changes in norms and standards which may occur after publication of these operating instructions.
Page 5
Installation and start-up • Drafts from windows and doors • Draft from ducts which lead from other rooms or from the outside to the junction box in which the sensor is mounted • Warming or cooling of the building structure on which the sensor is mounted, e.g.
Page 6
Installation and start-up Fig. 3 4-wire connecting cable for measuring value out- puts 0...10 V (only with TH PF-U): purple not connected yellow Humidity (0 V = 0%rF, 10 V = 100%rF) white Temperature (0 V = -10°C, 10 V = +50°C) black GND (together) Fig.
Page 7
Installation and start-up 2.3.3. Wiring diagrams Window Fig. 5: With relays (Measuring value outputs only with model TH PF-U) Ventilation Controls TH PF(-U) Status: 19.04.2016 • Technical Changes and Errors excepted.
Page 8
Installation and start-up Fig. 6 With Power Supply NG AQS/TH PF (Measuring value outputs only with model TH PF-U) Ventilation Controls TH PF(-U) Status: 19.04.2016 • Technical Changes and Errors excepted.
Page 9
Installation and start-up 2.3.4. Wiring diagrams Ventilation Units Fig. 7 With Relays (Measuring value outputs only with model TH PF-U) Ventilation Controls TH PF(-U) Status: 19.04.2016 • Technical Changes and Errors excepted.
Page 10
Installation and start-up Fig. 8 With Power Supply NG AQS/TH PF (Measuring value outputs only with model TH PF-U) Ventilation Controls TH PF(-U) Status: 19.04.2016 • Technical Changes and Errors excepted.
Installation and start-up 2.3.5. Wiring diagram smoke and heat extraction system Fig. 9 (Measuring value outputs only with model TH PF-U) 2.4. Sensor assembly First, place the windproof box with the supply connection. Then screw the base plate onto the junction box and position the frame of the switch range on top of this. Connect the operating voltage and all other connections.
Need help?
Do you have a question about the TH PF Series and is the answer not in the manual?
Questions and answers