Mercia Garden Products 01VINLOG0307-V1 General Instructions

Mercia Garden Products 01VINLOG0307-V1 General Instructions

3x7 log store and 3x7 store

Advertisement

Quick Links

General Instructions
01VINLOG0307-V1 & 01VINSTR0307-V1
3x7 Log Store and 3x7 Store
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.

TIMBER

As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for upto 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufactures recommendations. Care must be taken to ensure
the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
Pressure Treated Timber
Pressure treating is a chemical process which helps to protect wood against adverse weather which could
lead to rot or insect damage.
The most common chemicals used to pressure treat wood are Alkaline Copper Quaternary (ACQ),
Copper Azole (CA), and Micronized Copper Quaternary (MCQ).
Safety: Always wear gloves, eye protection and a dust mask when handling wood. Due to chemicals in
pressure treated wood, never burn its sawdust or scraps; instead dispose in a land ll.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
P 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 01VINLOG0307-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01VINLOG0307-V1

  • Page 1 All building’s should be Winter = High Moisture = Expansion erected by two adults Summer = Low Moisture = Contraction 01VINLOG0307-V1 & 01VINSTR0307-V1 3x7 Log Store and 3x7 Store BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY For ease of assembly, you...
  • Page 2 01VINLOG0307-V1 & 01VINSTR0307-V1 Please retain product label and instructions for future reference Pre Assembly Overall Dimensions: Length = 1885mm Width = 1003mm Before assembling remove the transportation Height = 1559mm blocks from the bottom of each panel. Base Dimensions: Length = 1861mm...
  • Page 3 Pre drill screw hole Step 4 Following the same method outlined Step 6: 01VINLOG0307-V1 Only in steps 2 & 3 x the second back panel and the right gable onto the Place the remaing front post onto the assembly. oor, aligning with the rear post. Secure...
  • Page 4 6x70mm screws as shown in the illustration. 21x30mm Black Screws *Ensure to screw through the roof into the posts. 30mm Pre drill screw 6x70mm Screws hole 70mm Pre drill screw hole *This step is the same for both 01VINLOG0307-V1 & 01VINSTR0307-V1.
  • Page 5 Please retain product label and instructions for future reference Step 10: 01VINSTR0303-V1 Only Fix the turn buttons to the top and bottom of the posts, ensuring they fasten the door, using 2x30mm black screws. Secure the hasp and staple to the post and door using 5x30mm black scerws.

This manual is also suitable for:

01vinstr0307-v1

Table of Contents