3-1 Installation work flow
Work flow
0. System planning
1. Setup file data preparation
2. Setup file creation
3. On site installation
(Construction work)
4. On site installation
(Wiring)
5. On site installation
(Control system configuration)
6. On site installation
(Address setting)
7. Trial operation and adjustment
8. Commissioning
Contents
Air conditioner equipments
selection
Control system device selection
System wiring diagram
Power meter wiring diagram
Address list
Schedule list
Create setup files by excel macro
software
Control system installation
Wiring power cable/
communication line
Network connection
Energy monitoring PC
configuration
Intellignet server configuration
Setup file installation
Air conditioner address setting
Control system device address
setting
24
Reference No.
Chapter. 2
3-2
3-3
3-4
3-5
3-6
3-7
Chapter. 4
Chapter. 5