Page 1
META Tower Gerätedokument Einbau, Betrieb und Wartung META Tower Equipment Logbook Assembly, operation and maintenance META Tower Livret d’appareil Installation, fonctionnement et entretien META Tower Verbale d’installazione Montaggio, funzionamento e manutenzione M E T A T O W E R...
Table of contents Explanation of pictograms Practice personnel, technicians 1. Table of contents The groups of people to which the relevant range of tasks applies are listed in the header. Chapter Page Table of contents Explanation of pictograms General instructions Type overview Layout Explanation of the type plate...
After commissioning, complete the proof of installation at the front page of this manual and send this to METASYS in order to define the warranty period. All inspection and service work must be entered into the device documentation at the first pages of this manual ...
The compressor in the META Tower produces dry and filtered compressed air as required to operate dental units or similar applications. Amalgam separation The METASYS ECO II / ECO II Tandem are amalgam separators on sedimentation base that are installed after the central suction system in the META Tower.
Construction Practice personnel, technicians 6. Construction See illustration META Tower A5 Suction system with dynamic separation 5.13 Pre-filter Control box Hose connection for air and exhaust air Compressor Cooler / pre-filter Dryer Tank Pressure switch Amalgam separator (only for models A2 / A5) 5.10 Expansion tank (only for models A2 / A5) 5.11...
E X C O M h y b r i d 5 = 400 V, 50 Hz = 9,0 A = 3,8 kW 0181 TW - 123456 Made in Austria METASYS Medizintechnik GmbH, Florianistr. 3 6063 Rum bei Innsbruck, Austria...
Technical data Practice personnel, technicians 8. Technical data META Tower 2 Power supply 400 V AC Frequency 50 Hz Max. current consumption 9,0 A Max. electric motor power 2,54 kW Max. ambient temperature 40° C Operating time 100% (60%) / Compressor 70% Tank capacity 30 l Sound level...
Practice personnel, technicians 9. Functional description The detailed functional descriptions for the devices that are installed in the META Tower are provided in the single device manuals and in the download area on www.metasys.com. See illustration 12.2 Main switch: 12.1 12.4...
Storage and transport conditions Installation guidelines Practice personnel, technicians 10. Storage and transport conditions The META Tower is delivered separately, on a pallet, wrapped in film and secured with plastic straps. The META Tower must be protected against moisture, dirt and external temperatures during transport.
Setup/assembly Practice personnel, technicians 12. Setup/assembly Before assembling the META Tower, ensure that all transport fasteners have been removed. See illustration 13.1 Remove the packaging and the transport fasteners See illustration 13.1 Set up and mount the top part of the housing to the bottom part 14.1 4 x fastening screws (M8 Allen screws) 14.1...
Page 11
Setup/assembly Practice personnel, technicians 12. Setup/assembly See illustration Connect the hoses (by numbers) Connect the compressor to the cooler (no. 1) 15.1 Connect the pressure switch to the pressure tank (no. 2) 15.2 15.1 15.2 Connect the vent pipe (no. 3) 15.3 Connect the condensation drain pipe to the pre-filter (no.
Electrical connections Commissioning Practice personnel, technicians 13. Electrical connections The electrical connection may only be established by trained electricians. Electrical installation must be carried out in accordance with national regulations. Before establishing the electrical connection, compare the rated voltage 18.1 on the device type plate with the mains voltage.
Page 13
Commissioning Practice personnel, technicians 14. Commissioning See illustration All fuses must be switched on in order to switch the META Tower on. Main switch 20.1 must then be pressed into the „I“ position. When the mains power supply is present, the switch illuminates green and the LED (Abfluss/Drain) flashes for a short time.
Page 14
(fan), characteristic C13 in in the META Tower are provided in the single device manuals and in the accordance with IEC/EN 60898-1 download area on www.metasys.com. Fuse 3 Fuse for suction machine, characteristic C13 in accordance with IEC/EN 60898-1...
Negative Pressure - Frequency Control Practice personnel / technicians 16. Negative Pressure - Frequency Control EXCOM hybrid 5 Legend: display Frequency control display - see illustration 26.1 After being switched on for the first time, y - H appears on the display.
Repair work going beyond normal servicing may only be carried out by a disposed of as electronic waste. The remaining metal parts must be qualified technician or by METASYS technical customer service. Only use disposed of as scrap metal. spare parts approved by the manufacturer and accessories designed for this purpose! All connections must be sealed when sending the device back, e.g.
Attachment I: Error description negative pressure - frequency control: Practice personnel / technician Fault code Type of faults Possible fault reasons Start-up time too short Short circuit on the output OC/ OC1 Overcurrent Blocked motor Incorrect parameter calibration O.L1 Inverter overload Load too heavy O.L2 Motor overloaded...
Page 18
METASYS ... makes the difference! Visit us at: METASYS Medizintechnik GmbH Florianistraße 3, 6063 Rum bei Innsbruck, Austria 1 +43 512 205420 | 5 +43 512 205420 7 www.metasys.com | info@metasys.com FRANCE ITALY GERMANY +49 8823 938 44 33 +33 4 37 90 22 15 +39 045 981 4477 info@metasys.com...
Need help?
Do you have a question about the META Tower Series and is the answer not in the manual?
Questions and answers