Topping Up Saw-Chain Oil; Bringing The Conveyor Into The Work Position - Palax D410 Series Instruction Manual

Powered by electric motor
Table of Contents

Advertisement

Topping up saw-chain oil

Filling capacity of the tank is about 3 litres
Check the saw-chain oil level regularly.
Top up the oil, as necessary. The canister 3 should always be at least a third full with oil.

Bringing the conveyor into the work position

1. Release the lock A and the lock chain B
for the conveyor, Fig. 9.
2. Unwind the winch wire a few rounds.
3. Pull out the conveyor and leave it
supported by the winch rope.
4. Lower the conveyor to the ground by
means of the winch.
5. Pull open the lock A, Fig. 10.
6. Swing down the top of the conveyor.
7. Remove the support bar B for the
conveyor chain, Fig. 10, and attach it
to the holes C at the edge of the
conveyor.
Palax D410 Pro+
18
Figure 8
Figure 9
Translation
1-2020

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Palax D410 Series

This manual is also suitable for:

D410 pro+

Table of Contents