Honoured users: Welcome to buy bathtub series handled by our company. For your safty, please read the instruction carefully before installation and using of the bathtub. Content: 1 Preparations-----------------------------------------------------------------------------------2 2 Installation process --------------------------------------------------------------------------3 3 Instruction of using our products-----------------------------------------------------------4 4 Cleaning & Maintaining---------------------------------------------------------------------8 1.
2. Installation process A-1 Install the change-over switch and cold-hot water switches Ⅰ) Screw off the cover of the Change-over switch Ⅱ) Screw off the screw and take off the switch Ⅲ) Install the change-over switch as the below pictures Show.
Page 5
Ⅳ) Install the 2 hot-cold water switches by the above mentioned procedures. Note that the change-over switch is in the middle of the 2 hot-cold water switches. Ⅴ) Connect the cold and hot water hoses with the brass connection. A-2 Install the waterfall.
A-3 Connect the shower hose to the white pipe with the brass connection. A-4 Connect the waste pipe A-5 Install the pillow 3. Instruction of using our products Instruction of control panel Panel 1 1) Water Pump Surf adjusting plus 2) Blower Frequency button 3) Thermostatic Heating...
Page 7
Panel 2 1) Signal receiving hole 5) Function confirmed 2) Menu/functionswitch/Station storage 6) Turn right 3) Power 7) Turn left 4) Adjusting button The LCD shows the following information 11 10 1) Icon and condition of Radio/Audio 7) Icon and condition Blower 2) Icon and condition of Pump 8) Frequency English icon 3) Icon and condition of Lamp...
Page 8
II) Operation instruction and direction Panel 1 Power ON/OFF Button Push down the switch, the controller is open, its status light is on and other function can be used only when power is ON. FM/ MP3 When the system is on, press the icon, FM function starts, press again, MP3 function is on, press another time, MP3 function stops.
Page 9
Ozone Sterilization Press this button for 2 seconds , the ozone function starts and works for 10 minutes and then stops;Or press twice to stop the function. Thermostatic Heating 10.1 This Function works only when the water pump surf function is on. 10.2 Press button to start the function, and press“...
Page 10
Blower When the water level achieves the setting value (according to the position of the level detector), move ,then press to start the blower. When the water level lower than the setting value, blower stops working. Lamp Press the power switch icon, lamp is turned on, lamp icon on LCD blinks; move and press lamp is turned off;...
Page 11
- Frequency plus : Press the icon to increase the length of one step( the length of one step =50KHz); press this button over 2 seconds, the system searches the radio stations of larger frequencies automatically; the digital phase locked loop will lock the FM station automatically and the liquid crystal shows the frequency of this station;...
- Move , press to start thermostatic heating function, on LCD blinks。 2 seconds later, thermostatic heating function starts or stops according to the temperature(the C) : temperature that the system defaults is 40 Controlling rule is as follows: If the temperature ≥ setting temperature+1℃,stop heating; If the temperature ≤...
Need help?
Do you have a question about the KF-618 and is the answer not in the manual?
Questions and answers