Download Print this page

RUD IVH Series Assembly Instruction

Shortening hook

Advertisement

Quick Links

Shortening hook
>IVH< / >VVH<
Assembly instruction
This assembly instruction/declaration of the manufacturer
has to be kept on file for the whole lifetime of the product.
TRANSLATION OF THE ORIGINAL ASSEMBLY INSTRUCTION
This assembly instruction is valid in addition to the
safety instructions for RUD Sling chains
(ICE-Nr. 7995555 or VIP-Nr. 7101649).
RUD Ketten
Rieger & Dietz GmbH u. Co. KG
73428 Aalen
Tel. +49 7361 504-1370
Fax +49 7361 504-1460
sling@rud.com
www.rud.com
EG-Einbauerklärung
entsprechend der EG-Maschinenrichtlinie 2006/42/EG, Anhang II B und ihren Änderungen
RUD Ketten
Hersteller:
Rieger & Dietz GmbH u. Co. KG
Friedensinsel
73432 Aalen
Hiermit erklären wir, dass die nachfolgend bezeichnete unvollständige Maschine den
grundlegenden Anforderungen der Maschinenrichtlinie 2006/42/EG (Anhang 1) entspricht.
Die nachfolgend bezeichnete unvollständige Maschine darf, in der gelieferten Ausführung
erst dann in Betrieb genommen werden, wenn festgestellt wurde, dass die Maschine, in
die diese unvollständige Maschine eingebaut werden soll, den Anforderungen der EG-
Maschinenrichtlinie 2006/42/EG entspricht.
_____________________________________________
Produktbezeichnung:
Verkürzungshaken
_____________________________________________
VVH / IVH
Folgende harmonisierten Normen wurden angewandt:
_________________
DIN EN 1677-1 : 2009-03
_________________
_________________
_________________
_________________
Folgende nationalen Normen und technische Spezifikationen wurden außerdem angewandt:
_________________
DIN 5692 : 2011-04
_________________
_________________
_________________
_________________
Die speziellen Unterlagen zur unvollständigen Maschine nach Anhang Vll Teil B
wurden erstellt und werden auf begründetes Verlangen in geeigneter Form übermittelt.
Für die Zusammenstellung der Konformitätsdokumentation bevollmächtigte Person:
Michael Betzler, RUD Ketten, 73432 Aalen
_____________________________________________
Dr.-Ing. Arne Kriegsmann,(Prokurist/QMB)
Aalen, den 14.02.2017
Name, Funktion und Unterschrift Verantwortlicher
_________________
DIN EN ISO 12100 : 2011-03
_________________
_________________
_________________
_________________
_________________
_________________
_________________
_________________
_________________
ICE
Grade 120
Shortening hook
Simple inspection, administration and documentation
of work equipment and components
which must be inspected regularly.
EC-Mounting declaration
According to the EC-Machinery Directive 2006/42/EC, annex II B and amendments
RUD Ketten
Manufacturer:
Rieger & Dietz GmbH u. Co. KG
Friedensinsel
73432 Aalen
We hereby declare that the following incomplete machines correspond to the basic re-
quirements of the Machinery Directive 2006/42/EC (annex 1). The following incomplete
machine, in the delivered machine, may only be put into operation when the machine
in which the incomplete machine shall be assembled, has been tested according to the
requirements of the EC-Machinery Directive 2006/42/EC.
Product name:
_____________________________________________
Grab hook
_____________________________________________
VVH / IVH
The following harmonized norms were applied:
_________________
DIN EN 1677-1 : 2009-03
_________________
_________________
_________________
_________________
The following national norms and technical specifications were applied:
_________________
DIN 5692 : 2011-04
_________________
_________________
_________________
_________________
The special documents about the incomplete machine according to annex VII part B
have been created and can be handed over in a suitable form on request.
Authorized person for the configuration of the declaration documents:
Michael Betzler, RUD Ketten, 73432 Aalen
_____________________________________________
Dr.-Ing. Arne Kriegsmann,(Prokurist/QMB)
Aalen, den 14.02.2017
Name, function and signature of the responsible person
EN
VIP
Grade 100
_________________
DIN EN ISO 12100 : 2011-03
_________________
_________________
_________________
_________________
_________________
_________________
_________________
_________________
_________________
IVH / VVH
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the IVH Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for RUD IVH Series

  • Page 1 TRANSLATION OF THE ORIGINAL ASSEMBLY INSTRUCTION This assembly instruction is valid in addition to the safety instructions for RUD Sling chains (ICE-Nr. 7995555 or VIP-Nr. 7101649). Grade 120...
  • Page 2 Temperatures exceeding 380°C are prohibited! perty damage and eliminates warranty. • RUD VIP Shortening hooks must not be used with ag- In doubt or in misconception please note gressive chemicals such as acids, alkaline solutions that the German version of this document and their vapours.
  • Page 3 • Leave hazardous area when possible. • Watch always attached loads. • Read for all lifting/lashing means the RUD sling chain Safety instructions for RUD sling chains resp. the corresponding WLL (ICE quality grade 120 or VIP grade 100).
  • Page 4 Pic. 8: Alignment Hints for repairing and maintenance • Loading must not occur at the tip of the hook • Only RUD original spare parts must be used and (pic 9). all repairing and overhauling operations must be documented in the chain card file (of the complete lifting mean) or use the AYE-D.NET.
  • Page 5 VIP-22 8503631 Chart 1: Dimension chart Technical alterations subject to change HINT The permissible WLL should be taken out of the according ICE- and VIP user´s instruction (or alternatively from the RUD website www.rud.com). Pic. 10: Dimensioning IVH / VVH...

This manual is also suitable for:

Vvh seriesIvh-6Ivh-8Ivh-10Ivh-13Ivh-16 ... Show all