Download Print this page

Piping Design; Refrigeration Piping - Samsung ECO HP Quick Reference Manual

Advertisement

Standard HP: Y piping for heat pump application
Standard HR: Piping for heat recovery application
© 2020 Samsung All rights reserved.

Piping Design

HR Changer
Paired ports
to increase
capacity

Refrigeration piping:

All piping specifications must be followed to insure that the system will
operate properly.
Maintain a minimum straight line distance: ≥ 20" before connecting to
a Y-joint.
Minimum 36" straight line between Y-joints.
HR Changer: Mandatory device for indoor unit mode changeover
HR Changer is installed as the first device in the refrigerant piping
network. (Heat recovery only)
Cool-only indoor unit is connected to the HR Changer low pressure
gas and liquid outgoing pipes.
Sub MCU required for additional indoor unit zones after the HR
Changer
Sub MCU
Cool-only unit
2

Advertisement

loading

This manual is also suitable for:

Eco hr