4. Use of VAKI Fish Pump ....................9 that can be manually operated from a control panel on the grader or automatically from the VAKI Counter which counts, size measures and calculates the split between 4.1 Electric model .........................9 Set up the grades.
VAKI offers warranty for any original parts that are used for repair for a period of one (1) year from date of delivery. All these factors contribute in making the system fairly complicated and hard to tune...
VAKI Fish pump is made of aluminum and fiberglass The VAKI Fish Pump is designed to work in all weathers, except for temperatures below 0 ° C Grading live fish is a fairly hard and complicated process. The system normally and provides very gentle handling of fish during (Celsius).
10th Press down arrow to scroll to "dEC" (deccelerate) this time setting the time to go from full from the VAKI Counter which counts, size measures and calculates the split between speed to stop.
6 Make sure the valves and lid of the priming tank is closed is used for quick and safe connection of hoses. The from the VAKI Counter which counts, size measures and calculates the split between Set up START THE PRIMING PUMP connections are designed and manufactured so that there the grades.
5 Lubricate the pump shaft bearing (under the main pump housing). IMPORTANT: before greasing from the VAKI Counter which counts, size measures and calculates the split between remove the screw on the opposite side of the shaft. Remember to replace the screw afterwards.
Page 8
The opening of the grader is controlled with electric linear actuators that can be manually operated from a control panel on the grader or automatically from the VAKI Counter which counts, size measures and calculates the split between Set up the grades.
Need help?
Do you have a question about the Fish Pump 8” and is the answer not in the manual?