TOOLS REQUIRED: MOVING CART/DOLLY FOR TRANSPORTING PANELS, TWO 9 FT. STEP LADDERS FOR INSTALLING ROOF & PANELS ROOF, AND POSTS 13MM FLAT WRENCH FOR LEVELING THE GLIDES OF STRUCTURE REVERSIBLE RATCHET 1/4“ DRIVE FOR CORNER SCREWS ON TOP TRAVERSE BEAMS ALTERNATIVE : 5MM ALLEN KEY https://www.kctoolco.com/hazet-863p-1-4-reversible-ratchet/ 8MM HEX BIT WITH EXTENSION FOR HEX BOLT SCREWS...
Page 3
MAIN ELEMENTS OF SKELETON FRAME: TOP TRAVERSE BEAMS VERTICAL POSTS SQUARE FLOOR BASE STANDARD PHONE CUBE PANELS: TECH ACOUSTIC PANEL STANDARD GLASS DOOR GLASS PANEL (DESK|POWER) ACOUSTIC PANEL Fabric faces are applied to both sides of each Acoustic Panel Tech Panel includes a conduit for power wiring to go through and T-nuts for the Desk installation...
Page 4
LOCATION OF THE TECH PANEL FOR DESK AND POWER The Desk and Power Tech Panel is commonly installed on the side adjacent to the door hinges (left side), but can also be installed on the rear or the right side. POWER CUTOUT IN TOP TRAVERSE BEAM One of the top traverse beams in each size (1026 and 1028) will have a cutout for power wiring to go through this beam and the Tech panel.
Page 5
ASSEMBLE THE SKELETON FRAME (DO NOT TIGHTEN SCREWS ALL THE WAY) TOP TRAVERSE BEAMS (TOP VIEW): TRAVERSE BEAM: WITH CUTOUT TRAVERSE BEAM: NO CUTOUT TOP TRAVERSE BEAMS TO VERTICAL POSTS CONNECTION DETAIL Assemble two parallel sides by securing vertical posts A and B with a 1026mm top traverse beam as shown above.
Page 6
LOCATE WHERE PHONE CUBE IS TO BE INSTALLED COUNTERSINK FACE UP Lay down the square floor base in the exact desired location for the Telephone Cube. Ensure that the door side is on the desired side and that the square base is placed face up, with countersink holes facing up.
Page 7
INSTALL POWER SOURCE CABLE IN TECH PANEL IF POWER IS COMING FROM THE FLOOR DISREGARD THIS STEP IF THE CONFIGURATION DOES NOT HAVE A TECH PANEL DISREGARD THIS STEP IF THE POWER SOURCE IS LOCATED OUTSIDE THE CUBE (CEILING, FLOOR OR WALL) 3 PIN APPROX 33FT LONG BOTTOM...
Page 8
INSTALL THE PANELS INTO SKELETON FRAME PER STEP Insert the Tech Panel from the bottom on an angle, then fit the sides and top into the skeleton frame. Use a flat pallet knife. If the source of power is coming from the floor, feed the GST cable through the top traverse beam’s power cutout.
Page 9
PREPARE AND INSTALL THE DOOR Preparing the Door Panel 1. Remove the protective piece of wood from the bottom of the door The door carefully by removing Black Plastic handle Strips: both leveling glides. package will They keep the be attached to door glass panel the glass door.
Page 10
ENSURE UNIT IS SQUARED/TIGHTEN THE BOLTS Square all corners and firmly tighten all of the corner screws and hex bolts located on top of the panels and door. Check that diagonal measurements from the inside are equal all around. FINAL LEVELING OF STRUCTURE Adjusting Leveling Glides: Loosening Leveling Tightening Leveling...
Page 11
FINAL LEVELING OF STRUCTURE Cont. Test Glass Door Panel: - Check the Glass Door Panel to make sure it’s not slanted (The gap between Glass Door and Door Frame should be approximately 1/4”). Correctly Leveled Glass Door Incorrectly Leveled Glass Door Panel Panel - Check if there is any scraping between the glass door...
Page 12
CONNECT LED LIGHT TO CEILINGS 24 V DC Before installing the roof onto the unit, connect the two wires coming out of the interior of the ceiling panel to the respective wires connected to the LED light. Ensure to the correct polarity of the connections made. CAUTION: Ensure correct White= Positive...
Page 13
INSTALL THE ROOF Occupancy Sensor Place the roof on top of the structure. The LED light should be directly above the desk and power, with the motion sensor on the opposite side. Turn the lower part 90 degrees with your finger Insert Roof Clips into the top traverse beams in and then tighten the screw in order to secure the the locations circled in the image to the right.
Page 14
INSTALL DESK ONTO TECH PANEL Screw the threaded rods provided in the Desk Kit into the tech panel. Install the desk onto the threaded rods on the tech panel. Secure with lock nuts provided. INSTALL POWER UNIT IN DESK Insert and install the power unit on to the surface of the desk through the grommet Connect the GST cable from the power hole.
CONNECT ALL WIRING Connect the desk|power, source, and ventilation system GST cables into the GST Triple tap extension. Female GST DESK/POWER (MALE) VENTILATION SYSTEM (MALE) Phone Cube Control Box POWER SOURCE (FEMALE) GST TRIPLE TAP EXTENSION 3-Pronged Plug IF POWER FROM...
Page 16
Then, insert the smaller rectangular pair onto each side of the bottom of the door frame. Some irregular floors might require foam filler strips under all 3 panels with exception of the door. USA: 100 Fulton Street Boonton, NJ 07005 TEL: 800.631.1186 FAX: 800.220.3844 EMAIL: info@dauphin.com WEB: dauphin.com CB1x1.02.15.19...