    TOOLS REQUIRED: MOVING CART/DOLLY FOR TRANSPORTING TWO 9 FT. STEP LADDERS FOR INSTALLING ROOF & PANELS PANELS, ROOF, AND POSTS #13 / 13MM FLAT WRENCH FOR LEVELING THE GLIDES OF MINI REVERSIBLE RATCHET 1/4“ DRIVE FOR CORNER SCREWS ON TOP TRAVERSE BEAMS ALTERNATIVE : 5MM ALLEN KEY https://www.kctoolco.com/hazet-863p-1-4-reversible-ratchet/ 8MM HEX BIT WITH EXTENSION FOR HEX BOLT SCREWS...
  • Page 3 MAIN ELEMENTS OF SKELETON FRAME: TOP TRAVERSE BEAMS VERTICAL POSTS SQUARE FLOOR BASE STANDARD PHONE CUBE PANELS: TECH ACOUSTIC PANEL STANDARD GLASS DOOR GLASS PANEL (DESK|POWER) ACOUSTIC PANEL Fabric faces are applied to both sides of each Acoustic Panel Tech Panel includes a conduit for power wiring to go through and T-nuts for the Desk installation...
  • Page 4 LOCATION OF THE TECH PANEL FOR DESK AND POWER The Desk and Power Tech Panel is commonly installed on the side adjacent to the door hinges (left side), but can also be installed on the rear or the right side. POWER CUTOUT IN TOP TRAVERSE BEAM One of the top traverse beams in each size (1026 and 1028) will have a cutout for power wiring to go through this beam and the Tech panel.
  • Page 5 LOCATE WHERE PHONE CUBE IS TO BE INSTALLED AND CHECK FLOOR LEVEL COUNTERSINK FACE UP - Lay down the square floor base in the exact desired location for the Phone Cube. - Use the floor frame to check if the floor is level.
  • Page 6 ASSEMBLE THE SKELETON FRAME (DO NOT TIGHTEN SCREWS ALL THE WAY) TOP TRAVERSE BEAMS (TOP VIEW): TRAVERSE BEAM: WITH CUTOUT TRAVERSE BEAM: NO CUTOUT TOP TRAVERSE BEAMS TO VERTICAL POSTS CONNECTION DETAIL Assemble two parallel sides by securing vertical posts A and B with a 1026mm top traverse beam as shown above.
  • Page 7 PLACE SKELETON ON FLOOR BASE & PREPARE UNIT FOR PANELS - Place the leveling glides of the - Raise the post by lowering the Vertical Posts into the outer leveling glide of any corners holes of the floor base. that had to be elevated with spacers (Refer to Step Adjusting Leveling Glides: Use the 13mm Flat Wrench to loosen/tighten the leveling glides...
  • Page 8 INSTALL THE PANELS INTO SKELETON FRAME PER STEP Insert the Tech Panel from the bottom on an angle. If necessary, use a flat pallet knife to push in the rubber gaskets. Feed the GST through the panel cutout if the power comes from inside. Push panel into frame.
  • Page 9 PREPARE THE DOOR PANEL Unscrew the leveling glides to remove the protective piece of DO NOT REMOVE wood from the Black Plastic Strips. bottom of the door. They keep the door glass panel in the door frame. Remove the Screw the leveling door handle glides back into the package.
  • Page 10 SECURE PANEL LEVELING GLIDES AND CORNER BOLTS -Insert all glides into their respective countersink holes. All leveling glides should be in their -If necessary, use a respective countersink 48” clamp from post-to-post to adjust the corner leveling glides. - The front post leveling glides Square all corners and firmly tighten should be adjusted to go into all of the corner screws.
  • Page 11 SECURE THE DOOR PANEL IMPORTANT: The glass door frame should have been checked before this point. Please refer to Step on Pg. 9 There are 3 holes on the door frame as highlighted in the images above. For each hole: - Drill a 1/8th inch pilot hole through the center of the hole through the vertical post of the skeleton frame - Install the screws provided.
  • Page 12 CONNECT LED LIGHT TO CEILINGS 11.a Before installing the roof, identify the polarity 24 V DC (positive/negative) of the two wires coming out of the interior of the ceiling panel. CAUTION: Ensure correct White= Positive polarity! Black/Brown/Red = Negative LED negative wire 11.b (Already connected) Lift the orange tab back, insert and...
  • Page 13 INSTALL WIRING FOR DESK POWER IN TECH PANEL GST TO GST 6FT CABLE MALE GST Feed the FEMALE GST end of the cable from the top down through the cutout of the top traverse beam into the conduit and out of the hole in the tech panel.
  • Page 14 INSTALL DESK ONTO TECH PANEL 14.a Screw the threaded rods provided in the Desk Kit into the tech panel. Install the desk onto the threaded rods on the tech panel. 14.b Secure with lock nuts provided. INSTALL POWER UNIT IN DESK 15.a 15.b Insert and install the power unit on to the...
  • Page 15: Power Source

    Connect the desk|power, source, and ventilation system GST cables into the GST Triple tap extension. Female GST 6 Ft. DESK/POWER (MALE) VENTILATION SYSTEM (MALE) Phone Cube Control Box POWER SOURCE (FEMALE) GST TRIPLE TAP EXTENSION 3-Pin Plug 33 Ft. IF POWER FROM...
  • Page 16 Then, insert the smaller rectangular pair onto each side of the bottom of the door frame. Some irregular floors might require foam filler strips under all 3 panels with exception of the door. USA: 100 Fulton Street Boonton, NJ 07005 TEL: 800.631.1186 FAX: 800.220.3844 EMAIL: info@dauphin.com WEB: dauphin.com CB1x1.03.13.19...