6. Commissioning NAD
The NAD is commissioned by ALARMNZ and those building service contractors who
require external network access to remotely program equipment need to contact the
AlarmNZ help desk to arrange testing.
NAD 3G wireless Commissioning check-list
NAD mounted in best signal location (near the Fire Alarm equipment )
NAD secured to wall with appropriate fasteners
Dedicated 230VAC feed – Switchboard, breaker, and location labelled at outlet.
Batteries dated and initialled – connected observing correct polarity
Connected Fire SGD's are being polled
Signals are being received by Alarm New Zealand
Connection documentation completed and returned to Alarm New Zealand
NAD ADSL Commissioning check-list
ADSL Ph, number of NAD ADSL line confirmed same as connection documentation
NAD mounted near Telecom Demarcation point.( ADSL BT Jack installed)
Captive BT jack-point upgraded on the Telco Demarcation point.
ADSL splitter installed at Telco Demarcation as per ADSL wiring diagram
NAD secured to wall with appropriate fasteners
Dedicated 230VAC feed – Switchboard, breaker, and location labelled at outlet.
Batteries dated and initialled – connected observing correct polarity
Connected Fire SGD's are being polled
Signals are being received by Alarm New Zealand
Connection documentation completed and returned to Alarm New Zealand