Download Print this page

THE RADIATOR COMPANY Seta Groove Fitting Instructions

Advertisement

Quick Links

Technical Specifications
Materials
Steel
Connections
1
"
flow and return.
2
Test pressure
10 Bar
Testing authority
EN442
Maximum operating pressure
8 Bar
Maximum working temperature
95ºC
Packaging
Encased in polystyrene, seated within a cardboard box
PLEASE NOTE: Systems using micro bore pipework must have adequate pressure and flow
rates for the number and style of radiators on the system.
Terms & Conditions
All products must be inspected once removed from the packaging and The Radiator Company
notified within 28 days of delivery of any scratches, blemishes or other damage.
The Radiator Company will then replace the radiator.
Imperfect radiators should therefore not be fitted and The Radiator Company will not accept
responsibility for replacement of scratched or damaged radiators once they have been fitted.
This includes any consequential loss or cost of fitting.
If The Radiator Company are not notified within 28 days of the date on the signed delivery note
then it will be deemed that The Radiator Company have fully complied with its obligations and
claims will not be considered.
Failure to comply with any of the above may invalidate any claims. We recommend that after
you check the product on delivery that it is stored in its packaging to prevent damage prior to
installation. The Radiator Company cannot accept responsibility for items damaged after delivery.
Guarantees & Liabilities
As we are not the manufacturers of this product we will take all reasonable endeavours to make
over to you the benefit of any warranty or guarantee given by the manufacturer, which is usually
five years on most of our range. (Copies of specific guarantees for any of our products are
available on request).
The guarantees in all cases are subject to the products being installed in accordance with British
and or European standards as well as these fitting instructions. The guarantees in all cases are
restricted to the free of charge replacement or repair of the failed product only. Our liability will
under no circumstances extend beyond the repair or replacement of the product supplied by us.
Claims for either labour in replacement or damage to property are not admissible. Any goods
that are returned, in the event of a problem, will belong to The Radiator Company.
If you have any questions please contact us on 01342 302250
www.theradiatorcompany.co.uk
THE
RADIATOR
COMPANY
Fittings Instructions
Seta is a revolutionary new range of radiators
designed to be both practical and energy efficient.
Secondary internal tubing is used to increase
surface area, producing both lower water content
and higher outputs.
Please read these instructions and terms and conditions
carefully prior to installation.
Failure to do so may invalidate the warranty
The Radiator Company
Units 13 - 14 Charlwoods Road
East Grinstead
West Sussex
RH19 2HU
SETAGL1.4
If you have any questions please contact us on 01342 302250
www.theradiatorcompany.co.uk
Seta Groove & Line
5

Advertisement

loading
Need help?

Need help?

Do you have a question about the Seta Groove and is the answer not in the manual?

Questions and answers

Summary of Contents for THE RADIATOR COMPANY Seta Groove

  • Page 1 This includes any consequential loss or cost of fitting. If The Radiator Company are not notified within 28 days of the date on the signed delivery note then it will be deemed that The Radiator Company have fully complied with its obligations and claims will not be considered.
  • Page 2 • 4 Hex Bolts • Stepladder (for taller radiators) • 4 Grub Screws PLEASE NOTE : Seta Line and Seta Groove are very heavy, therefore they should Hang Radiator & Commission Bracket Positions only be hung on solid walls. Accurately mark out bracket holes on wall using spirit level, to With the brackets (F) firmly fixed to the wall and the diverter (C) in place, dimensions shown within the Technical Data section (see left).

This manual is also suitable for:

Seta line