Sentinel Eliminator TotalGuard Installation Manual

Sentinel Eliminator TotalGuard Installation Manual

Central heating filter

Advertisement

Eliminator TotalGuard
Installation Manual
Central Heating Filter
Version 2 – January 2016
IMPORTANT
Please retain these instructions
for reference during servicing
Page 1
Eliminator TotalGuard Instructions (26-01-16).indd 1
26/01/2016 16:39

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Eliminator TotalGuard and is the answer not in the manual?

Questions and answers

Summary of Contents for Sentinel Eliminator TotalGuard

  • Page 1 Eliminator TotalGuard Installation Manual Central Heating Filter Version 2 – January 2016 IMPORTANT Please retain these instructions for reference during servicing Page 1 Eliminator TotalGuard Instructions (26-01-16).indd 1 26/01/2016 16:39...
  • Page 2 Page 2 Eliminator TotalGuard Installation Manual V2 01/16 Eliminator TotalGuard Instructions (26-01-16).indd 2 26/01/2016 16:39...
  • Page 3: Table Of Contents

    General Description Schematic Diagram System Design Mounting Considerations Installation Procedure 9–11 Servicing Dosing Technical Specification Guarantee Please visit www.sentinelprotects.com/uk/guarantee-registration for Guarantee Registration and Terms and Conditions. Page 3 Eliminator TotalGuard Installation Manual V2 01/16 Eliminator TotalGuard Instructions (26-01-16).indd 3 26/01/2016 16:39...
  • Page 4: Safety Considerations

    Safety Considerations SAFETY CONSIDERATIONS • Sentinel Eliminator TotalGuard™ filter is a vessel under pressure containing a hot fluid. In the interests of reliable long term operation, it is strongly recommended that the Sentinel Eliminator TotalGuard filter is only installed by a qualified plumber or heating engineer.
  • Page 5: General Description

    General Description GENERAL DESCRIPTION The Sentinel Eliminator TotalGuard central heating filter is designed for the effective removal of all types of debris associated with wet central heating systems. Sophisticated hydrocyclone technology is employed to remove both magnetic (such as magnetite) and non-magnetic particles with equal effectiveness.
  • Page 6: Schematic Diagram

    The main elements of the filter are shown below in Figure 1. Isolation valve Bleed valve Dual seals Directional T piece Flow arrow Collar Isolation valve Collection bin Anti-tamper drain valve Fig. 1: Filter components Page 6 Eliminator TotalGuard Installation Manual V2 01/16 Eliminator TotalGuard Instructions (26-01-16).indd 6 26/01/2016 16:39...
  • Page 7: System Design

    System Design SYSTEM DESIGN The Sentinel Eliminator TotalGuard filter is suitable for use on sealed and open vented wet central heating systems with 22mm pipework only. Please do not attempt to install on a 28mm system: the cyclones are not optimised for the flow rates normally associated with these larger systems.
  • Page 8: Mounting Considerations

    T piece is observed. Rotate T piece to suit pipework Check ow direction Mount lter vertically Fig. 2: Vertical or horizontal pipe Page 8 Eliminator TotalGuard Installation Manual V2 01/16 Eliminator TotalGuard Instructions (26-01-16).indd 8 26/01/2016 16:39...
  • Page 9: Installation Procedure

    Ensure heating system is turned off and drained. Step 2: Boiler Position filter on return pipe close to boiler, as per Figure 3. Fig. 3 Page 9 Page 9 Eliminator TotalGuard Installation Manual V2 01/16 Eliminator TotalGuard Instructions (26-01-16).indd 9 26/01/2016 16:39...
  • Page 10 Re-tighten the collar by hand, checking the flow direction on the T-piece, as per Figure 5. Page 10 Eliminator TotalGuard Installation Manual V2 01/16 Eliminator TotalGuard Instructions (26-01-16).indd 10 26/01/2016 16:39...
  • Page 11 Sentinel X500 Inhibited Antifreeze (whichever is appropriate for the Fig. 6 property in question). Correct levels of inhibitor can be checked with a Sentinel X100 Quick Test Kit. Page 11 Eliminator TotalGuard Installation Manual V2 01/16 Eliminator TotalGuard Instructions (26-01-16).indd 11 26/01/2016 16:40...
  • Page 12: Servicing

    Fig. 8 Step 5: If necessary, re-pressurise the system, topping up with Sentinel X100 Inhibitor (as required). Check carefully for any leaks. Page 12 Eliminator TotalGuard Installation Manual V2 01/16 Eliminator TotalGuard Instructions (26-01-16).indd 12 26/01/2016 16:40...
  • Page 13: Dosing

    Dosing DOSING It is possible to use the Sentinel Eliminator TotalGuard filter as a chemical dosing point for Sentinel’s Rapid Dose products following the sequence below: Step 1: Assemble dosing adaptor in line with the Rapid-Dose instructions (for use with bleed pin).
  • Page 14: Technical Specification

    Isolation Valving 22mm ball valve, compression fit GUARANTEE REGISTRATION Please complete and return the form opposite to Sentinel to register for your 5 year guarantee. Alternatively, you can register online at http://www.sentinelprotects.com/uk/guarantee-registration and select Eliminator TotalGuard. Full Terms and Conditions can also be found on the website.
  • Page 15: Guarantee

    Address Postcode Telephone Email Sentinel Performance Solutions Ltd and its sister companies may wish to send you information on products, services and promotions in the future. If you would like to receive communications please tick here – via Post Email...
  • Page 16 CUSTOMER SERVICES For expert advice, any more information about the Sentinel Eliminator TotalGuard or any other product in the range please contact customer services at: Sentinel Performance Solutions Ltd. 7650 Daresbury Park Warrington Cheshire WA4 4BS Tel +44 (0) 1928 704 330 www.sentinelprotects.com...

Table of Contents