VADO NOTION TAB-128/3WO-NOT-CP Installation Manual page 6

3 handle, 3 outlet thermostatic shower valve
Table of Contents

Advertisement

Installation
263mm
90mm
Fixing points
MIN
MAX
Mortar guard (wall shown in minimum position)
Select the position for the shower valve and offer the shower valve to the wall,
make sure the valve is level and mark the 6 fixing points with a suitable pencil, see
above for dimensions. Remove the shower valve from the wall, drill the holes to a
suitable depth for the wall plugs and secure with suitable screws.
10
Mortar
guard
Fixing
screws
Wall
Installation
Connect hot supply to the lower right
inlet of the valve and cold supply to the
upper right inlet.
Connect outlet 1 & 2 to the desired
channels e.g. outlet 1 to the shower
head, outlet 2 to the bath.
Note: outlet 3 will be connected to the
handset.
Finish the wall by tiling up to the
mortar guard, keep the final finished
wall surface between the min and max
marks.
Unscrew the 2 mortar guard screws
and remove from the wall.
Your valve is now ready to be
commissioned.
Please refer to page 14 to ensure your
valve is calibrated.
Outlet
Cold
2
Handset
outlet
Outlet
Hot
1
Mortar guard
screws
Mortar
guard
11

Advertisement

Table of Contents
loading

Table of Contents