Page 1
Read all these instructions before operating this product and save these instructions. This manual has been compiled by Draper Tools and is an integrated part of the product with which it is enclosed and should be kept with it for future references.
Page 2
DECLARATION OF CONFORMITY We : Draper Tools Ltd., Hursley Road, Chandler’ s Ford, Eastleigh, Hampshire. SO53 1YF . England. Declare under our sole responsibility that the product: Stock No:- 43924. Part No:- EC2000/PRO. Description:- 2 TON ENGINE CRANE. To which this declaration relates is in conformity with the following directive(s) 2006/42/EC.
Page 3
ASSEMBLY, USE AND OPERATION ASSEMBLY, USE AND OPERATION As we are handling heavy elements, it is essential to carry out the following assembly processes with the help of other people. - To assemble the legs (10 and 11) of foldable cranes, it is necessary to position the crane on the ground with the wheels in the position indicated in Figure 18.
Need help?
Do you have a question about the EC2000/PRO and is the answer not in the manual?
Questions and answers