Unihoist Student 150 User Instruction Manual page 14

Standing & transport aid
Table of Contents

Advertisement

Maintenance Schedule for Student 150
All Unihoist products are designed for minimum maintenance, however some
safety checks and procedures are required. A schedule of DAILY checks and
tasks are detailed below.
Daily checks and biannual service, inspection and test will ensure a Lift is kept in
optimum safe working condition. A list of spare parts is available upon request.
L
O
A
D
T
E
S
T
The
competent personnel or an authorised service dealer.
Daily Check List
Unihoist Ltd strongly recommend the following daily checks are carried out before
using the lift.
MAKE sure the Lift moves freely on its castors.
MAKE sure the legs open and close correctly .
OPERATE the handcontrol or hydraulic unit to con rm the boom raises and
lowers satisfactorily.
CONFIRM the Lift is not giving a low battery alarm when the hand control is
operated. If the alarm sounds DO NOT use and place on charge immediately.
CONFIRM
h t
MAKE sure the mast is fully engaged and the locking knob is fully tightened.
EXAMINE
s
n i l
r f
y a
n i
g
r o
a d
m
MAKE
s
u
e r
and CERTIFICATION should only be carried out by quali ed,
e
c
r o
e r
t c
o
p
e
a r
o i t
g
f s
r o
r f
y a
n i
g
r o
a
g
e
o t
h t
e
s
s u
p
n e
h t
e
U
s
r e
M
a
n
u
l a
n
f o
h t
e
e
m
e
g r
n e
y c
o
h t
r e
a d
m
a
g
. e
i s
n o
t s
a r
s p
o
t r
a e
s i
a
a v
a l i
b
e l
SF24 Iss.5 Nov.2011
s
o t
p
b
t u
o t
. n
DO NOT use any sling with
s r
n i
h t
e
b
o
y d
f o
h t
e
s
n i l
. g
13

Advertisement

Table of Contents
loading

Table of Contents