Price Pfister SANTIAGO R89 Series Manual page 3

Table of Contents

Advertisement

Available languages

Available languages

7
7A
7D
7C
7E
7 TRIM FLANGE ATTACHMENT
Position Flange (7A) on Valve (7B) with Drain Hole (7C) at the bottom. Place
Protective Washer (7D) on the short end of the reversible Retainer Sleeve
(7E). Screw Retainer Sleeve (7E) onto threaded section of the Stem and
Bonnet (7G). Tighten Retainer Sleeve (7E) by hand until Flange (7A) is snug
to fi nished wall surface. If the short end of the Retainer Sleeve (7E) is too
short, reverse it to use the longer end.
8
8A
8D
8C
8E
8 HANDLE ATTACHMENT
Screw Stem Extender (8A) onto the Valve Stem (8B). Thread the Set Screw
(8C) into the Handle (8D) and thread it in only three to four turns. With valve
in "CLOSED" position, place Handle (8D) onto the Stem Extender (8A) and
tighten the Set Screw (8C) by using the Hex Wrench (8E) that is provided.
Make sure Set Screw (8C) is securely tightened to handle (8D).
7G
7B
7C
8B
ENGLISH
9
9 SHOWER ARM INSTALLATION
Insert the longer end of Shower Arm (9A) through the Shower Flange (9B).
Apply PTFE plumber's tape to both ends of Shower Arm (9A) according to
manufacturer's instructions. Screw the end of Shower Arm (9A) into pipe elbow
inside the wall. Slide Shower Flange (9B) tight to the wall.
10
10B
10 SPOUT INSTALLATION
Apply PTFE plumbers tape on both ends of Pipe Nipple (10A) (not included).
Screw Pipe Nipple (10A) into the elbow inside the wall and tighten with pipe
wrench. The Pipe Nipple (10A) is to project 3
Screw Tub Spout (10B) onto Pipe Nipple (10A) and tighten until Spout is properly
positioned and fl ush to the fi nished wall.
11 UNIT START UP
Turn on hot and cold water supplies, and check all connections for leaks.
3
9B
9A
10A
" to 4" from the fi nished wall.
/
" to 4 "
3
7
8

Advertisement

Table of Contents
loading

Table of Contents