Download Print this page

Toro 31212 Installation Instructions Manual page 11

60in and 72in blower kit for groundsmaster 360 and 7200 series triple bagger hopper

Advertisement

10
Installing the New Belt Cover
Bracket Upon Removal of the
Kit
(For Model 31212 Only)
Parts needed for this procedure:
1
Belt cover bracket
2
Carriage bolt (1/4 x 3/4 inch)
2
Locknut (1/4 inch)
Procedure
1. Drill 2 holes (0.266 inch or drill size H) into the top
deck assembly with a sharp drill bit; refer to
for the correct positioning.
Figure 21
1. 9.5 cm (3.75 inches)
2. 4.5 cm (1.75 inches)
2. Install the new belt cover bracket with 2 carriage bolts
(1/4 x 3/4 inch) and 2 locknuts (1/4 inch) as shown
in
Figure
22.
Figure 22
1. Locknut (1/4 inch)
2. Drilled hole
Figure 21
3. 1.9 cm (0.75 inch)
3. New belt cover bracket
4. Carriage bolt (1/4 x 3/4
inch)
11
Installing the Throttle Stop
For CE Compliant GM7200 or GM7210
International Machines with Kubota
Engines
Parts needed for this procedure:
1
Throttle stop
Procedure
Note: This procedure is only for CE compliant GM7200 or
GM7210 international machines with a Kubota
1. Remove the nut and washer securing the speed control
lever to the governor shaft
1. Throttle stop
2. Nut and washer
2. Insert the throttle stop onto the governor shaft so the
tab rests against the flat on the speed-control lever
(Figure
23).
3. Install the washer and nut onto the shaft and torque to
9.7 to 12.0 N∙m (86 to 106 ft-lb).
11
®
engine.
(Figure
23).
Figure 23
3. Speed-control lever

Advertisement

loading

This manual is also suitable for:

31213