Page 1
Hymel 2 without meter 11/20/2014 1005 Updated to new hardware Paryani BTCPower EVP Series EVSE Rev C This document is the Property of Broadband Telecom Power Installation and Operations Manual Inc. and will not be copied, reproduced, or used as the basis for sale or manufacture of apparatus without written permission.
Page 2
This user’s manual includes the latest information at the time of printing. BTC Power, Inc. (BTCPower) reserves the right to make changes to this product without further notice. Changes or modifications to this product by other than an authorized service facility could void the product warranty.
Page 3
4.2 Normal Operation 4.3 In case charging does not start 5.0 FOR THE SERVICE TECHNICIAN 5.1 Specifications 5.2 Warranty Information BTCPower EVP Series EVSE Rev C This document is the Property of Broadband Telecom Power Installation and Operations Manual Inc.
Page 4
CAUTION avoided, may result in minor injury Important information to consider, otherwise, improper installation and/or damage to components may occur. NOTE: BTCPower EVP Series EVSE Rev C This document is the Property of Broadband Telecom Power Installation and Operations Manual Inc.
Page 5
• This device utilizes high voltages do not attempt to install this equipment if you are not a qualified electrician. BTCPower EVP Series EVSE Rev C This document is the Property of Broadband Telecom Power Installation and Operations Manual Inc.
Page 6
The GFCI is automatically software tested so no user interaction is required to verify proper operation. In the event of a failure, the system will indicate a fault via a red LED or a message on the User Interface screen. BTCPower EVP Series EVSE Rev C This document is the...
Page 7
Pedestal EVSE Installation Instructions EVP-1001-01 EVP-1001-01 EVP-1001-02 Fig. 1 EVP – 1001 – 00 Pedestal mounted EVSE BTCPower EVP Series EVSE Rev C This document is the Property of Broadband Telecom Power Installation and Operations Manual Inc. and will not be copied, reproduced, or used as the basis for sale or manufacture of apparatus without written permission.
Page 8
A minimum of 4 expansion bolts should be mounted on the bottom enclosure footer. In order to install the expansion bolts please follow the following steps: INSTALLATION STEPS Fig. 3 Expansion Bolt installation steps. BTCPower EVP Series EVSE Rev C This document is the Property of Broadband Telecom Power Installation and Operations Manual Inc.
Page 9
Fig. 4 Place pedestal charging assembly over installation fixture BTCPower EVP Series EVSE Rev C This document is the Property of Broadband Telecom Power Installation and Operations Manual Inc.
Page 10
Fig. 5 Mount charger onto lower fixture and secure utilizing Qty 4, ¼ - 20 bolts. Fig. 6 Side view installation BTCPower EVP Series EVSE Rev C This document is the Property of Broadband Telecom Power Installation and Operations Manual Inc.
Page 11
To mount the EVP-XXX using the wall mount system provisioned please follow the following steps. 1. Mount the secure rear hold bracket as described by Fig. 9 BTCPower EVP Series EVSE Rev C This document is the Property of Broadband Telecom Power Installation and Operations Manual Inc.
Page 12
EVP EVSE unit. Place flat water tight washer. In order to install the expansion bolts please follow the following steps: BTCPower EVP Series EVSE Rev C This document is the...
Page 13
The EV – XXX (wall mount) is provisioned to receive an electrical power connection from the bottom of the pedestal as shown in Fig. 11 BTCPower EVP Series EVSE Rev C This document is the...
Page 14
/ chassis interface Fig. 10 Electrical conduit bottom entry onto enclosure Mount EVSE onto EV hold bracket as shown on Fig. 12 BTCPower EVP Series EVSE Rev C This document is the Property of Broadband Telecom Power Installation and Operations Manual Inc.
Page 15
WARNING: Failure to provide adequate structural strength for this component can result in serious personal injury or damage to equipment! It is the installer’s responsibility to make sure the BTCPower EVP Series EVSE Rev C This document is the Property of Broadband Telecom Power Installation and Operations Manual Inc.
Page 16
Fig. 15 EV 2001-00 EVSE front and side view BTCPower EVP Series EVSE Rev C This document is the Property of Broadband Telecom Power Installation and Operations Manual Inc.
Page 17
4. Double check that the mount will be level using a level. It is crucial that you mount it level. 5. Drill qty 6 15/64 inch pilot holes used to install the mounting bracket onto the wall. BTCPower EVP Series EVSE Rev C...
Page 18
• Typically city agencies require a 20% margin in panel breaker sizing. So a 40A EVSE will require a 50A breaker. Check with local codes. BTCPower EVP Series EVSE Rev C This document is the...
Page 19
Note: Each hot lead should measure 120 vac to ground. Service Connections Connect L1 and L2 to the input safety breaker. BTCPower highly recommends crimp ferrule lugs to be used to make all electrical connection to the input safety breaker. This requires the correct crimping tool.
Page 20
4 wall mount screws. Bring in 110vac power via one of the knock-outs and attach wires here. BTCPower EVP Series EVSE Rev C This document is the Property of Broadband Telecom Power Installation and Operations Manual Inc.
Page 21
2) If a vehicle is available, connect the EVP EVSE to the vehicle and verify that the contactor closes The main screen should now look like this: BTCPower EVP Series EVSE Rev C This document is the Property of Broadband Telecom Power Installation and Operations Manual Inc.
Page 22
Fig. 21 Screen 1 Charger Available Installation is complete. BTCPower EVP Series EVSE Rev C This document is the Property of Broadband Telecom Power Installation and Operations Manual Inc. and will not be copied, reproduced, or used as the basis for sale or manufacture of apparatus without written permission.
Page 23
EVSE. Wait a few seconds and switch the circuit breaker back on again. If the Protection light does not come back on, re-connect the cable to the vehicle. Charging should begin normally. If charging does not begin, call for Field Service. BTCPower EVP Series EVSE Rev C This document is the...
Page 24
Cable Length approximately (16 ft) Environmental rating Operating Temperature -10°C / +40°C NEMA Rating 3R; outdoor use with rain, snow, and sleet conditions. BTCPower EVP Series EVSE Rev C This document is the Property of Broadband Telecom Power Installation and Operations Manual Inc.
Page 25
BTCPower or an authorized BTCPower representative or dealer has been advised of the possibility of such damages or of any claim by any other party.
Need help?
Do you have a question about the EVP Series and is the answer not in the manual?
Questions and answers