Download Print this page

Wilbur Curtis Company PTTD-3 Instructions

Iced tea brewer

Advertisement

Quick Links

F
F
IND OUT MORE
IND OUT MORE
.
.
ON THE WEB
ON THE WEB
WILBURCURTIS.COM
WILBURCURTIS.COM
MODELS INCLUDED
MODELS INCLUDED
MODELS INCLUDED
MODELS INCLUDED
MODELS INCLUDED
• • • • • TCTD-35
• • • • • TCTD-35S
• • • • • PTTD-3
• • • • • TCO-308
• • • • • TCO-417
• • • • • TCO-421
WARNING HOT LIQUID,
Scalding may occur.
Avoid splashing.
CAUTION:
CAUTION:
CAUTION:
CAUTION:
CAUTION: Please use
this setup procedure
before attempting to use
this brewer. Failure to follow the
instructions can result in injury or
the voiding of the warranty.
CAUTION:
CAUTION:
CAUTION: DO NOT
CAUTION:
CAUTION:
connect this brewer to
hot water. The inlet valve
is not rated for hot water.
WARNING TO AVOID
SCALDING, Do not
remove brewcone while
brew light is flashing.
C
ISO 9001 REGISTERED
WILBUR CURTIS COMPANY
Montebello, CA 90640
W W W W W
ILBUR
ILBUR
ILBUR
ILBUR
ILBUR
Iced Tea Brewer Instructions
Important Safeguards/Conventions
This appliance is designed for commercial use. Any servicing other than cleaning and maintenance should be
performed by an authorized Wilbur Curtis service center.
• Do NOT immerse the unit in water or any other liquid
• To reduce the risk of fire or electric shock, do NOT open top or front panel. No user serviceable parts inside.
Repair should be done only by authorized service personnel.
• Keep hands and other items away from hot parts of unit during operation.
• Never clean with scouring powders, bleach or harsh implements.
Conventions
Conventions
Conventions
Conventions
Conventions
W W W W W ARNINGS –
ARNINGS –
ARNINGS –
ARNINGS – T T T T T o help a
o help a
o help avoid personal injur
o help a
ARNINGS –
o help a
Important Notes/Cautions – from the factor
Important Notes/Cautions – from the factor
Important Notes/Cautions – from the factory y y y y
Important Notes/Cautions – from the factor
Important Notes/Cautions – from the factor
Sanita
Sanita
Sanita
Sanitation Requirements
Sanita
tion Requirements
tion Requirements
tion Requirements
tion Requirements
Curtis ADS System is Factory Pre-Set and Ready to Go... Right from the Carton.
Following are the Factory Settings for your Iced Tea Brewing System:
• Brew Temperature = 204°F
• Concentrate = 1 Gallon
System Requirements
• Water Source: 20 – 100PSI (Min Flow Rate of 1 GPM)
Equipment to be installed to comply with applicable federal, state, or local plumbing/electrical codes having jurisdiction.
SETUP STEPS
1. Place unit at counter height. on a firm, level base, in such a way that it can be connected to water and power supply.
2. Connect water line to inlet fitting on valve. Water pressure entering brewer is required to be stable and must provide
minimum of 1 gallon per minute. Use water regulator for constant pressure. Required water pressures, 20 to 100 psi.
2. Plug power cord into electrical outlet rated 20A.
3. Turn on toggle switch, behind unit. Heating tank will start filling. When the water reaches probe,heating element
turns on automatically.
4. Heating tank will require 20 to 30 minutes to attain operating temperature. READY TO BREW indicator will light at
this time.
5. Insert brewcone. Place empty tea container under brew cone. With water at operating temperature, run brew cycle,
without tea, for about 1 minute. This clears the water lines of air. Stop the brew cycle by switching off at ON/OFF
button. Discard water in tea container.
The National Sanitation Foundation requires the following water connection:
1. A quick disconnect or additional coiled tubing (at least 2x the depth of the unit) so that the machine can be moved for
cleaning underneath.
2. In some areas an approved backflow prevention device may be required between the brewer and the water supply.
BREWING
INSTRUCTIONS
1. Place filter in brew basket.
Pour leaf tea into basket.
FOR THE LATEST SPECIFICATIONS AND INFORMATION GO TO
C C C C C
C C C C C
URTIS
URTIS
OMP
OMP
URTIS
URTIS
URTIS
OMP
OMPANY
OMP
void personal injury y y y y
void personal injur
void personal injur
void personal injur
• Dilution = 2 Gallon
• Drip Mode = 30 Seconds
• Electrical: See attached schematic for standard
model or visit www.wilburcurtis.com for your model.
2. Slide brew cone into brew
rails. Place tea container
under brew cone.
WWW.WILBURCURTIS.COM
, I , I , I , I , I
. . . . .
ANY
ANY
NC
NC
ANY
ANY
NC
NC
NC
3. Press the BREW button to
brew tea.
1

Advertisement

loading

Summary of Contents for Wilbur Curtis Company PTTD-3

  • Page 1 • Do NOT immerse the unit in water or any other liquid • • • • • PTTD-3 • To reduce the risk of fire or electric shock, do NOT open top or front panel. No user serviceable parts inside.
  • Page 2 STEPS TO PROGRAMMING ONLY REQUIRED IF FACTORY SETTINGS MUST BE CHANGED PROGRAMMING Changing the ADS™ System Program Your ADS System features a dynamic memory. In the event of a power loss it will remember ALL program settings. WARNING These steps involve working with hot water.
  • Page 3 Illustrated Parts List - TCTD-35/35S Curtis Iced Tea Brewer, Continued from page 2 Illustrated Parts List - TCTD-35/35S Curtis Iced Tea Brewer, Continued from page 2 Illustrated Parts List - TCTD-35/35S Curtis Iced Tea Brewer, Continued from page 2 Illustrated Parts List - TCTD-35/35S Curtis Iced Tea Brewer, Continued from page 2 Illustrated Parts List - TCTD-35/35S Curtis Iced Tea Brewer, Continued from page 2 ITEM ITEM...
  • Page 4 ELECTRICAL ELECTRICAL ELECTRICAL ELECTRICAL ELECTRICAL SCHEMA SCHEMATIC SCHEMA SCHEMA SCHEMA WARRANTY We hereby certify that the products manufactured by the Wilbur Curtis Company, Inc., are, to thebest of our knowledge, free from all defects and faulty workmanship. The following warranties and conditions are applicable: •...

This manual is also suitable for:

Tco-308Tco-417Tco-421Tctd-35Tctd-35s