Download Print this page
Carrier Infinity 50DT Series Installation Instructions Manual
Carrier Infinity 50DT Series Installation Instructions Manual

Carrier Infinity 50DT Series Installation Instructions Manual

14 single-packaged heat pump system
Hide thumbs Also See for Infinity 50DT Series:

Advertisement

Quick Links

Turn to the Expertg
Installation
Instructions
IMPORTANT:
OAT
sensor
must
be
field
installed.
See
Accessory
Installation
for more details.
IMPORTANT:
This Infinity
_ unit is designed
for use with an
Infinity
User Interface.
NOTE:
Read
the entire
instruction
manual
before
starting
the
installation.
TABLE
OF CONTENTS
Page
SAFETY
CONSIDERATIONS
........................
2
INTRODUCTION
..................................
2
RECEIVING
AND INSTALLATION
................
2-10
Check Equipment
.................................
2
Identify
Unit
...................................
2
Inspect
Shipment
................................
2
Provide Unit Support
..............................
2
Roof Curb
.....................................
2
Slab Mount
....................................
2
Ground
Mount
.................................
2
Provide
Clearances
................................
6
Rig and Place Unit
................................
6
Inspection
.....................................
6
Introduction
....................................
6
Use of Rigging
Bracket
...........................
6
Select and Install Ductwork
..........................
7
Converting
Horizontal
Discharge
Units to Downflow
(Vertical)
Discharge
Units
.........................
8
Provide for Condensate
Disposal
.....................
8
Install Electrical
Connections
........................
8
High-Voltage
Connections
........................
8
Routing
Power Leads Into Unit ....................
10
Connecting
Ground
Lead to Ground
Screw
..........
10
Routing
Control
Power Wires
....................
10
Accessory
Installation
...........................
10
Special
Procedures
for 208-v
Operation
.............
10
PRE-START-UP
..................................
12
START-UP
....................................
12-21
Unit Start-Up
................................
12-16
Sequence
of Operation
.........................
16-19
Check for Refrigerant
Leaks
........................
19
Start-Up
Adjustments
.............................
19
Checking
Cooling
and Heating
Control
Operation
.....
19
Checking
and Adjusting
Refrigerant
Charge
..........
19
Refrigerant
Charge
.............................
19
No Charge
....................................
19
Low Charge
Cooling
............................
19
To Use Cooling
Charging
Charts
...................
19
Indoor Airflow
and Airflow
Adjustments
............
19
Non-Communicating
Emergency
Cooling/Heating
Mode
. 19
Fig. 1 - Unit 50DT
C99001
MAINTENANCE
...............................
21-24
Air Filter
.......................................
22
Indoor
Fan and Motor
.............................
22
Outdoor
Coil. Indoor
Coil, and Condensate
Drain Pan
....
22
Outdoor
Fan
....................................
22
Electrical
Controls
and Wiring
......................
22
Refrigerant
Circuit
................................
22
Indoor Airflow
. .................................
22
Metering
Devices-TXV
& AccuRater
Piston
..........
23
Pressure
Switches
................................
23
Loss-of-Charge
Switch
...........................
23
High-Pressure
Switches
...........................
23
Copeland
Scroll Compressor
(Puron ®: Refrigerant)
.......
23
Refrigerant
System
...............................
23
Refrigerant
...................................
23
Compressor
Oil ................................
23
Servicing
Systems
on Roofs with Synthetic
Materials
...
23
Liquid-Line
Filter Drier
.........................
23
Puron (R-410A)
Refrigerant
Charging
..............
23
TROUBLESHOOTING
.............................
24
FINAL
CHECKS
..................................
25
CARE AND MAINTENANCE
.......................
25
START-UP
CHECKLIST
...........................
29

Advertisement

loading