Download Print this page

Cambro CVC75 Owner's Manual page 3

Vending carts

Advertisement

I. Display Case and Extender Installation Cont.
Step 5
Install hex bolts&
Install hex bolts
Washers into end of
& Washers into
Display Case Shelf,
end of Display
Case Shelf, depth
depth matching the
matching the
space on the raiser.
space on the
Adjust in to fit the
raiser.
recess in the raiser
II. Extender Installation / Side Shelves
CVC75DC12
CVC75DC6
Insert two plastic plugs into
the two small holes on the shelf
Position the Shelf onto the clear panels
and nest the hex bolts with the raisers
plus locate the dowels with the holes
on the shelf.
Lower the Center Cap with
the 4 rods onto the raiser and
nest the hex bolts with washers
Fasten down until 1.5 threads
Step 5
are beyond the nut
Place the 15.5" rod through
the shelf and corner supports
and finally through the
main shelf
After all rods are positioned and not
protruding higher than the surfaces adjacent
to the recess areas, fasten the nuts snug but
do not over tighten.
CVC75DCE12
CVC75DCE6
Step 6
Snap
into recess
after all
items are
done.
Step 6
3

Advertisement

loading

This manual is also suitable for:

Cvc75b