During Assembly - Palram Glory 8'x8' Manual

Extension module
Hide thumbs Also See for Glory 8'x8':
Table of Contents

Advertisement

During Assembly
Make
sure
the
base
is
square by measuring the diagonals and level by using
a
spirit
level.
You
may
use
silicone lubricant spray
in
order to help you slide the
panels
into the
profiles.
Do
not spray the polycarbonate
panels.
Use
a
rubber mallet if
necessary.
All panels
with
the stamped words
"THIS
SIDE
OUT"
must
be
facing out to create
full
UV
protection.
Remove plastic sticker
as
panels
are
locked
in place.
When
encountering the information
icon, please refer to the relevant
assembly step for additional comments and
assistance.
This icon
indicates
that the installer should
be
inside the product.
This
icon indicates
that
the installer should
be
outside the product.
In
Attention
During assembly
use
a
soft surface below the parts to avoid scratches and damages.
Steps
Step
4:
Refers
only for the extension
kit! The
extension kit contains
a
base
connector, either part
#8447 or #7601
Step 11:
Please
make
sure
the screw connection
is
made exactly
as
illustrated.
A
-
Connect the screw
in
the left hole.
B -
Connect the screw
in
the right
hole.
Step
13:
Peel
the
film covering the
panel.
Make sure you install it
with the
UV
protected
side
out.
Step 23: Side Louver
Window:
can be
located only on one
of
the
two
central
panels.
* If
you assemble the greenhouse
with
an
extension module, the
window
can be
placed on
all
panels,
except for the
last
two
end panels.
*
Note:
The
selected placing will affect the next assembly
steps.
Step 31:
It
is
highly recommended to
paste
the sealing tape
at
the
bottom
edge of
panels
7903
+
7904
is
order to prevent moisture
seepage.
Step 38:
Roof
window
can be
located only on one of the two central roof
panels.
* If
you assemble the greenhouse
with
an
extension module, the roof windows must
be
placed on
panels
only
as
specified
in
the manual.
*
Note:
The
selected placing will affect the next assembly
steps.
Step 43:
Please
tighten
screws
from inside the greenhouse.
In
addition,
please
tighten
the
remaining
loose screws.
Step 48:
As
mentioned
at
the
'Before Assembly' section,
prior to
fitting
the
Automatic
Vent Opener,
the power-tube
has
to
be
cooled
by
placing it
in
a
refrigerator for
approximately
30
minutes.
Step 57: Door
can be
installed
as
a
left hand door or right hand
door
as
per
your decision.
These
instructions show
a
right
hand
door
assembly.
Please
determine door opening
direction.
This
decision will affect the next assembly
steps.
Step 59:
Please
adjust the hinges height
in
accordance
with
the upper post and lower ramp
of
the door aperture,
as
specified
in
Level
C.
Step 63:Threading parts 7888 exactly
as
specified
in
Level
B, is
very
important
in
order to
create
good drainage.
Step 67: Anchor the greenhouse on to
a
solid surface such
as
concrete or asphalt,
use
suitable
screws
and plugs.
(Screws and plugs are
not supplied).
* Please
tighten
all
screws
when completing assembly.
Screws
411
and nuts
412
&
466
are used
thruoghout
the assembly
process.
Screws
411
are
to
be
assembled from the outside and nuts 412
&
466
from the inside of
the greenhouse.
Do
not fasten screws and nuts (411,412
&
466) more
than
2-3
turns only.
Do
not
tighten
them until completion of the panels'assembly, if not specified otherwise.
However,
in
some
steps,
temporary tightening of
a
few
screws may
be
needed to
prevent
a
profile from falling.
Note:
Firmly connect the product to
a
level surface
immediately after completion of the
assembly.
Anchoring this product to the ground
is
essential to
its
stability
and rigidity.
It
is
required
to complete this
stage
in
order for your warranty to
be
valid.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Glory 8'x4'

Table of Contents