Spare Parts ................21 Warranty statement .............. 21 DECLARATION OF CONFORMITY MC_0020 Sleipner Motor AS P.O. Box 519, Arne Svendsensgt. 6-8 N-1612 Fredrikstad, Norway Declare that this product with accompanying standard control systems complies with the essential health and safety requirements according to:...
(NB: These instructions are only general instruction. If you are not skilled to do this work, please contact professional installers for assistance.) All electrical work must be done by a licensed professional. Faulty installation of the tunnel, thruster or panel will render all warranty given by Sleipner Motor AS void. MC_0038 Installation Considerations and Precautions MC_0071 •...
* Standard tube (Hull thickness <50mm) * Extended tube for thicker hull models (Hull thickness >50mm to <150mm) MG_0110 Thruster Measurements MC_0239 Measurement Measurement description code inch inch Motor Height 14.72 14.72 Width 7.20 7.20 Length Standard tube length Extended tube length for thicker hulls 10.9 10.9 Height of support bolts from tube...
Engine Engine Water line Water line The thruster can be installed in multiple locations based on object obstructions on the stern. Thruster assembly does not disturb the water flow under the hull. Water flow Engine Thruster tunnel is clear Steering Arm from obstruction.
Cowl water flow redirection Shallow installation Composite material with smooth inner walls for optimal water flow and strength Radiused corners prevent turbulence A standard Sidepower stern thruster tunnel with add-on cowls for shallow installation An angled edge further preventing air attraction into the tunnel cowls to change the water flow direction to...
(NB: These instructions are only general instruction. If you are not skilled to do this work, please contact professional installers for assistance.) All electrical work must be done by a licensed professional. Faulty installation of the tunnel, thruster or panel will render all warranty given by Sleipner Motor AS void. MC_0038 Installation Considerations and Precautions MC_0071 •...
Detail #1 MG_0145 Grids or Cowls assembly MC_0074 1. Install the cowls or grids before mounting the new tunnel to the thruster. (NB: Remember the tunnel can not be removed without being destroyed.) 2. Drill 4 holes in the mould marking on the tunnel. 3.
Align two ends of the tunnel. Ensure top lips tabs into the motor inserts. Push two tunnel ends together. Check snap lock positions around the tunnel. MG_0112 Tunnel Installation MC_0074 ! Please refer to the graphic for special considerations relating to your model ! Ensure grids or cowls are installed if in use.
Hull IMPORTANT The spacer and hull have different hole diameters for the support bolts. This is to Drill allow the compression rings to be 8.5 / 9 mm inserted into the hull only. The spacer and hull for the main tube have the same hole diameter so compression rings can be inserted for the total length of the hole.
130 mm 1 - 3 4 - 5 5,12” Hole size for hull Bolt and Washer 18 mm 35,80 mm 0,71” 1,41” 50 mm 65 mm 1,97” 2,56” Drill holes in hull All rings need Maximum hull thickness +15% compression is 50 mm or 150mm Hull thickness Sealant (MS Polymer)
BAT. + # SX35 CONTROL BOX 5, 6 Nm Hose claps BAT. - 5, 6 Nm MOTOR CABLE - 6 1232i MOTOR CABLE + TORQUE 8Nm BAT. + 5, 6 Nm # SX50 CONTROL BOX BAT. - 5, 6 Nm MOTOR CABLE - Control Box hose clamp...
CONTROLLER To control panel(s)/remote. Control Cables BLUE HOSE Temp switch NC (900mm/ 35”) Automatic MAIN SWITCH MAIN FUSE THRUSTER BATTERY THRUSTER (MUST BE IGNITION PROTECTED IF LOCATED IN IP REQUESTED AREA) CONTROLLER CONNECTIONS: <<B+>>: Power supply pos from thruster battery/ Main switch/ Main fuse <<B->>: Power supply neg from thruster battery 2 Motor cables from thruster 4 wires from thruster overtemp switch...
Page 16
Thruster Electrical Installation Control Cables Blue Hose Tighten to 5, 6 NM 4,13 lb/ft # SX35 CONTROL BOX Tighten to Tighten to 5 NM 5 NM Temp switch NC 3,69 lb/ft 3,69 lb/ft Blue Hose (BLUE HOSE) Temp switch NC Tighten to *Only used for PRO systems 5, 6 NM...
Thuster Motor Ext. cable Y cable 4- or 5-lead 4- or 5-lead Ext. cable 4- or 5-lead * 4 OR 5 LEAD EXTENSION CABLES Manual Main switch Automatic Main switch Thuster * 5 LEAD EXTENSION Motor CABLES Y cable Ext. cable 5-lead 5-lead Ext.
Example of control panels (4) COVERING CAPS GASKET CABLES (4) SCREWS (4) COVERING CAPS COVERING CAP GASKET CABLES (4) SCREWS GASKET CABLES (4) SCREWS MG_0026 Control Panel Installation MC_0042 ! Please refer to the graphic for special considerations relating to your model ! Find a suitable location for the control panel where it does not obstruct or is obstructed by other devices.
Pre-delivery Checklist MC_0081 ..Propeller is fastened correctly to the shaft... Propeller turns freely in tunnel... Primer and anti-fouling have been applied to the gearhouse and propeller but NOT on the anode or the gearhouse lid where the propeller is fastened...
Warranty statement MC_0024 1. The equipment manufactured by Sleipner Motor AS (The “Warrantor”) is warranted to be free from defects in workmanship and materials under normal use and service. 2. This Warranty is in eff ect for of two years (Leisure Use) or one year (Commercial use) from the date of purchase by the user. Proof of purchase must be included, to establish that it is inside the warranty period.
Page 24
Norway The information given in the document was correct at the time it was published. However, Sleipner Motor AS can not accept liability for any inaccuracies or omissions it may contain. Continuous product improvement may change the product specifi cations without notice. Therefore, Sleipner Motor AS can not accept liability for any possi- ble differences between product and document.
Need help?
Do you have a question about the SIDE-POWER SX35 and is the answer not in the manual?
Questions and answers