Quick Mount PV QBox Installation Manual page 14

Patented junction box for composition/asphalt shingle roofs
Table of Contents

Advertisement

Two Combining Strings
WIRE NUT – AQUA/ RED & AQUA/BLUE INSTALLATION INSTRUCTIONS
IMPORTANT: Turn off power before installing or removing connector.
Product to be used in accordance with local and national codes.
1. AQUA/RED ONLY: Strip wires 7/16" (11.1mm).
2. AQUA/BLUE ONLY: Strip wires 3/4" (19.1mm).
3. Align any frayed strands or conductors.
4. Pre-twisting is unnecessary. Place stripped wires together with ends of insulation even.
5. Twist connector onto wires pushing firmly until hand-tight. Do not over torque.
6. Wipe sealant in and around conductors and connector opening while tightening. Do not reuse.
BI 7.2.3-44
Nov-2017, Rev 2
12

Advertisement

Table of Contents
loading

Table of Contents