Sensor Positioning; Commissioning And Test Procedures - Pentair Raychem GM-2CW Installation Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 7
a. Sensor positioning
1. For optimal performance ambient sensor shall be placed on the north part of the
building.
2. Moisture sensor shall be positioned on south building side at the lowest level.
2
1

5. Commissioning and test procedures

For installation documentation use the commissioning report document
ML-RaychemGMCW-CR-EU0515 available in the packaging.
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Raychem gm-4cw

Table of Contents