Installation of Denfit StreetWorkout

In soft surface

The Street Workout units are installed on separate foundation frames that are placed 900, 750 or
600 mm into the ground:
Make sure that the frames are completely level and connect the frames with the connecting strips.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the StreetWorkout and is the answer not in the manual?

Questions and answers

Summary of Contents for Denfit StreetWorkout

  • Page 1 Installation of Denfit StreetWorkout In soft surface The Street Workout units are installed on separate foundation frames that are placed 900, 750 or 600 mm into the ground: Make sure that the frames are completely level and connect the frames with the connecting strips.
  • Page 2 To ensure stability of the product, the baseplate of the installation frame must be covered with a minimum of 600, 450 or 300 mm of dry sand up to the minimum dry sand level mark. Only do this after the post has been anchored to the frame.
  • Page 3 To ensure the correct bar height, dry sand or loose filling (fall protection like bark mulch, woodchip, gravel or Playtop) must be applied up to the surface level (= footplate of the post). The height between the Minimum dry sand level and the footplate is 300 mm (maximum possible fall protection).
  • Page 4 Tighten the security bolts completely ONLY when the posts are level and then close the hole with sand, at least until the dry sand level marking.
  • Page 5 Fill up the location with the desired fall protection: The result is a perfect Street Workout location!