Download Print this page

Equinox Systems Canyon Assembly Instructions And Operations Handbook page 4

Advertisement

Stage 2: Attaching Frame to Body
For this stage you will require:
(1) T-Frame
(4) M8 x 65 mm Pan Head Bolts
(6) M8 Locknuts
(6) M10 x 25 mm Carriage Bolts
(6) M10 Lock Nuts
Take the "T" frame and lay it down on a flat surface.
You will see four holes in the hitch channel. Insert the
two M8 x 20 mm Pan Head Bolts through the L-bracket
and the hitch channel as shown in Figure #6.
The Round Combination bolt must be flush with the
hitch channel.
On the axle of the "T" frame there are four predrilled
holes, place one of the "L" brackets over one side of
the predrilled holes. Insert two of the M8 x 65 mm
Pan Head Bolts through the holes of the bracket and
axle. Now secure each bolt with a M8 flat washers and
M8 Nylon Locknuts. Repeat procedure for the other
side of the axle, when completed your frame should
now look like Figure #7.
FIGURE 6
Turn the Canyon body upside down to begin installation.
Place the Canyon frame on the body. Make sure that you
centre the frame on the body. See Figure #8.
With a 10 mm drill bit, drill each bracket hole through the
plastic body. To attach the frame and body reach inside
the body and insert the six M10 x 25 mm Carriage bolts
through the newly drilled holes.
On the outside of the body/bracket place a M10 washer on
to the bolt and secure with a M10 nylon locknut.
TIP: Hold carriage bolt using only the tip of a pair of pliers.
(3) L-Brackets
(6) M8 Washers
(2) M8 x 20 mm Pan Head Bolts
(6) M10 Washers
FIGURE 5
FIGURE 7
FIGURE 8

Advertisement

loading