INSTALLATION
INSTALLATION
11 WATER CONNECTIONS
9
During installation, pay attention to the position of the probe with respect to the collector. The collector probe must always be
in the upper section of the panel as indicated in the figures below.
VERTICAL CONFIGURATION
HORIZONTAL CONFIGURATION
When tightening a fitting,
HOLD THE OPPOSITE
FITTING STEADY WITH
A SECOND TOOL
to avoid damage
insulated connector
pipe
10
When tightening a fitting,
HOLD THE OPPOSITE
FITTING STEADY WITH
A SECOND TOOL
to avoid damage