ABB Relion 620 Series Applications Manual page 71

Advanced recloser protection and control
Hide thumbs Also See for Relion 620 Series:
Table of Contents

Advertisement

1MAC308145-MB E
RER620
Application Manual
Figure 47:
LHMI - captioned LCM Source "S1 & S2 Enable" and "Loop Scheme
Reset" buttons
The condition for any source to be enabled in tie-point mode is to set the settings Vt line
enable and Vt load enable as TRUE and the respective source enable push buttons need to
be activated as explained above. The configuration logic for source selection is shown in
Figure 48.
HOTLINE_TAG
ZBAT1_TST_RESULT
DLCM1_LCM_S1_EN
DLCM1_LCM_S2_EN
DLCM1_LCM_RESET_OUT
Figure 48:
Logic for DLCM "S1 & S2 Enable" and "Loop Scheme Reset
Once the line side source is selected the phases of the respective source is identified by
giving the number of voltage transformers connected to the respective source.
In case of sectionalizer mode, the Vt config line setting is selected with number of voltage
transformers connected. If the Vt config line is "1" or "2",the Vt line phase setting is
selected as the phase to which the voltage transformers is connected. The Vt line enable
should be TRUE to consider the settings Vt config line and Vt line phase.
FKEYGGIO1(FKEYG
L1
K1
L2
K2
L3
K3
L4
K4
L5
K5
L6
K6
L7
K7
L8
K8
KEY_8
L9
K9
L10
K10
L11
K11
L12
K12
L13
K13
L14
K14
L15
K15
L16
K16
KEY_16_EMERGENCY_OPEN
Section 3
RER620 application
SPCGGIO1(SPCGGI
IN1
O1
SPCGGIO1_O1
IN2
O2
SPCGGIO1_O2
IN3
O3
SPCGGIO1_O3
IN4
O4
SPCGGIO1_O4
IN5
O5
SPCGGIO1_O5
IN6
O6
SPCGGIO1_O6
IN7
O7
IN8
O8
SPCGGIO1_O8
IN9
O9
SPCGGIO1_O9_GND_BLOCK
IN10
O10
SPCGGIO1_O10_RECLOSE_BLOCK
IN11
O11
IN12
O12
SPCGGIO1_O12_50SEF_BLOCK
IN13
O13
SPCGGIO1_O13_DLCM1_S1_EN
IN14
O14
SPCGGIO1_O14_DLCM1_S2_EN
IN15
O15
SPCGGIO1_O15_DLCM1_RESET_IN
IN16
O16
65