Page 2
Gaius DUO Gaius DUO Attachment points, 8 pcs Water and electric Seinäkiinnitys 8 kpl Vesi ja sähköpisteet 17782, 17783 17782, 17783 17785, 17786...
Page 3
Structure The product has undergone static load testing at 500 kg. The size of the wall mounting fixtures is 700x1150 mm. The fixtures must be affixed to solid structures. The fixtures must be mounted in accordance with the measurements specified in the diagram. Electrics The electrical junction box must be positioned to the right of the mid-line, as shown in the draw- ing.
Notice! General instructions: Use motor up and down to help installation. If frame don´t go down by motor, press moving frame by hand. 17783 floor drain 1. Add clamp ONLY 17783, oor drain. Connect electricity: Affix the frame to the wall: Must not exeed 50mm from the wall!
Connect hose: Drain: Mark up 17782 wall drain 1. Add hose holder 2. Install hose 1500mm, thread downwards Drain: 1. Wrap motor cable 2. Add water pipe Mark up 17783 2b. Clamp...
Page 6
1. Water tank on it´s place 2. Connect hose to water tank 1a. Tie water hose to clamp 1b. Tie water hose to clamp with ground wire 1. Pull out water hose, from right 2. See Gustavsberg Manual Instructions ”Bushing pipes with Protective tube 18-28MM”...
Page 10
Do not try to unclog any blockage via the toilet bowl as this may damage the flexible pipe. Always perform unclogging by moving the implement in the direction of the building’s drain pipes. In a case of checking or clogging: 1.
Need help?
Do you have a question about the Duo 17782 and is the answer not in the manual?
Questions and answers