1.Intall the boiler cover
2.Put on the water tank
05
Install the boiler cover. After installation,
firmly press down on the boiler cover.
Install the water tank. Secure the water
tank in the card slot of the machine to
stabilize the water tank.
1.combine the upper and lower parts first
2.mixing chamber is docked with the
fuselage
06