NOTE: Numbers in parentheses refer to item numbers in the table on p1.
STEP 1 Attach Weldment (11)
Align axle holes in weldment with
axle channel (refer to exploded diagram
on front page) in the base of the
trash bin
Insert axle through weldment holes and
axle channel
STEP 2 Attach wheels to ends of the axle
Press wheels onto the ends of the
axle until they latch onto the axle.
(Pins inside the axle receiver of
each wheel hold onto grooves
milled into the axle.)
STEP 3: Attach foot lever (10) to axle bracket
weldment
Fasten foot pedal shims (7) to the weldment
using nuts (8) & bolts (9) as shown in the
diagram to the right.
Do not tighten theses connections yet.
Insert foot lever (10) around trash bin, then
insert the ends of the pedal under the shims
& between the bolts.
STEP 4: Connect lid lifting weldment (6) to axle bracket
weldment
Insert end "A" through hole "B" in the center of the
bracket weldment
Secure the connection with a cotter pin (5) through the
end of the lifting weldment
STEP 5: Connect lid lifter bracket (1)
Connect lid lifter bracket (1) to lid lifting bar
(6) with ¼ bolt (4) & hex nut (2)
STEP 6: Attach lid
Place lid over top of bracket (1).
Align handle brackets with handle & insert
the handle plugs (13).
11
6
9
B
A
5
14
Axle
receiver
14
10
7
8
2
1
13
6
4