3. MAIN COMPONENTS ARE LISTED BELOW :
DESCRIPTION
Bottom angle 50x50x3mm
Top angle 50x50x3mm
Back angle 50x50x3mm
Spacer 25x25x3mm
Mounting rail
Lapping plate 40x4
End clamp
Mid clamp
Spring nut
Allen head M8x25 1B
Allen head M8x35 1B
DIN 933 M8x20 screw
DIN 933 M8x30 screw
DIN 6923 M8 nut
DIN 6798 M8 washer
Cable clip
EACH 1 KW BOX CONTAINS THESE ELEMENTS
Spring Nut
Mid Clamp

3.2 Mounting Process

In order to perform the assembly process, assembly drawings will be
provided by
PROINSO PV
whole installation, it is recommended to assembly an individual kit in order
to make position marks for the different components. Before starting the
assembly of the structure, it is necessary to check that all required
components and tools are ready to start the process.
All necessary steps for the assembly of the components that make up the
kit, after installing anchorages roof, are described below.
4
MATERIAL
COATING
AW 6063 T5
Anodized
AW 6063 T5
Anodized
AW 6063 T5
Anodized
AW 6063 T5
Anodized
AW 6063 T5
Anodized
AW 6063 T5
Anodized
AW 6063 T5
Anodized
AW 6063 T5
Anodized
A2
SS 304
A2
SS 304
A2
SS 304
SS 304
A2
SS 304
A2
SS 304
A2
SS 304
A2
SS 304
End Clamp
Fasteners
RACK. Before starting the assembly of the

3.2.1 Assembly of the concrete pads:

Previous to the installation of the structure, have to be done a concrete
slabs which dimensions recommended by a local engineer depending
the location of the project. At the same time the concrete is poured an
anchorage should be embedded with the enough distance out of
concrete to permit install the fixed with DIN 6923 M8 A2 nuts. To
install the triangle structure just take screws into the holes prepared
fixed with DIN 6923 M8 A2 nuts.
Correct position for the triangles should be checked in the
corresponding kit drawing.
Triangle
NEEDED TOOLS AT THIS POINT ARE:
Open end wrench no 13 or torque wrench with socket no 13.