Mounting Of Eartch Switch Type E And Eartch Switch; Type Lces; Mounting Of Eartch Switch To The Switch- -Disconnector Type Nal/Vr; Mounting The Eartch Switch To The Fuse-Switch - ABB NAL Series Mounting And Operation Manual

Indoor air switch-disconnector
Table of Contents

Advertisement

9.0 Mounting of earth switch type E (Fig. 32) and earth switch
type LCES (Fig. 33)
The switch will normally be delivered for connection of the hand
operating mechanism on the right hand side and any mechanical
interlook on the left side. The splined extension intended for con-
nection to the hand operating mechanism will have free travel.
The extension for the interlook will be bolted to the shaft,
see Fig. 32.
9.1. Mounting the earth switch to the switch-disconnector
type NAL/VR
The contacts A are mounted on the terminals of the switch
disconnector, and the surfaces of the main contacts are then
covered by contact grease. (Recommended grease: ISOFLEX
TOPAS NCA 52).
Close the earth switch slowly and adjust the fixed contacts to line
up correctly with moving contacts. Tighten the contacts screws.
Fig. 32 Earthing switch type E mounted on the NAL/VR switch disconnector | Fig. 33 Earthing switch type LCES | Fig. 34 Mechanical interlick
for earthing switch
Fig. 32
Fig. 34
9.2 Mounting the earth switch to the fuse-switch

disconnector type NALF/VR

Proceed as under item 7.1. The contacts A must be mounted
on the terminals of the fuse base, and secured in position with
tension bushes.

10.0 Mounting the mechanical interlock between switch

disconnector and earth switch. Fig. 32-34
The switch disconnector must be in the open position (for NAL/
VR-A the opening spring must be charged before assembly of the
interlock, see item 4.1).
The earth switch must also be in the open position. Put one half
of the guide A (side plate) on the operating shafts of the switches.
Mount the interlock connection B. Mount the interlock rings C and
D on the shafts with the flat part of the ring facing towards the
interlock connection B, see Fig. 34.
Do not forget to mounting the two distance rings E on the two
screws F.
Fig. 33
NAL/NALF/VR – Mounting and operation manual 13

Advertisement

Table of Contents
loading

Table of Contents