Page 1
DOOR SIZE MT6900 series is suitable for door up to 2500mm height and up to 1000mm width. MAINTENANCE It is recommended that the following routine maintenance check be undertaken at intervals of not less than one month by the occupier or approved representative: a.
A. PARTS CHECK 1. Make sure the correct tools being used. 2. Make sure all parts are ready for install. 3. Make sure Euro profile cylinder and handles Note: Do not use electric Screwdriver to install have been provided. Machine Screw X 4 Wood Screw X 4 Face Plate Screw X 2...
DOOR PREPARATION 1. Door must be fitted and hung properly before proceeding. 2. Measure 1100MM from finished floor, mark a horizontal line on door and door edge. Centerline (Lever handle) Installation Manual Door preparation (Below instructions all are use right hand open direction to install) Measure the 1100MM height from the floor to the door edge.
Page 5
B. Strike installation Drill a Ø 28.4mm hole with 25mm depth and 135 High on the center of strike outline. Use the chisel to scrape out the door frame for 160.4mm high, 28mm width and 1.5mm deep. Drill Ф3.0mm with 15mm Depth of screw holes (top and bottom). Then insert the strike plate and tighten it with screws.
Page 7
4. Insert the lock case into cut-out position and fasten screws to door. 5. Fix the cylinder base with mounting screws. 6. Insert cylinder into lock though door. Fix in position with the M5 screw, check the operation of the lock bolt from both sides. Fix the cylinder cover. 7.
Page 8
Wiring Diagrams zapah gumb za cilinder izhod pomožni zapah The copyright is for BSI use only. BSI Security Co., Ltd www.bsi-hardware.com sales@bsi-hardware.com 2158 Union Street, Simi Valley, CA, USA Tel: +01-818-642-1383...