Advertisement

Quick Links

sm
Breathing is Believing...
FC-400
I
,
O
M
Our Mission
G
To improve health and wellness
by actively restoring indoor air
to its pure, natural state where
no pollution or contaminants exist,
while reducing energy use
and emmisions in the process.
IMPORTANT
www.AtmosAir.com
S
F
R
CAG 11 19 001 USA
W
I

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FC-400 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for AtmosAir FC-400 Series

  • Page 1 FC-400 Our Mission To improve health and wellness by actively restoring indoor air to its pure, natural state where no pollution or contaminants exist, while reducing energy use and emmisions in the process. IMPORTANT www.AtmosAir.com CAG 11 19 001 USA...
  • Page 2: Important Warnings

    Observe all local, state, national and international electrical codes. • Pay close attention to all warnings and caution notices given in this guide. How to Contact us: If you need help, please contact an AtmosAir Representative for technical assistance. Contact Us 1-888-MY-AIR11 (1-888-692-4711) www.AtmosAir.com...
  • Page 3: Table Of Contents

    1.2 Product Diagrams 2. Installation Page 5 Page 5 Mechanical Installation 2.2 Electrical Installation Page 6 3. Operation Page 6 4. Maintenance Requirements Page 7 5. Troubleshooting Page 8 6. More Products Page 9 Contact Us 1-888-MY-AIR11 (1-888-692-4711) www.AtmosAir.com CAG-07-19-002-USA...
  • Page 4: Product Overview

    The number and size of the ionization units used is dependent upon the airflow, size of the space, and severity of the pollution and odors. The AtmosAir FC-400 series equipment is designed for minimal maintenance. The FC-400 series has two components that require inspection and maintenance: 1.
  • Page 5: Installation

    Installation, Operation & Maintenance Guide - FC-400 2. Installation AtmosAir FC-400 series equipment can be mounted using the baseplate mounting flange. The units operate best when located after all filters, coils, and fans. Various mounting arrangements are possible; however, the available options may be limited due to size and configuration restrictions. When mounted, the FC-400 ionization system should not be exposed to condensing moisture or excessive heat (See Product Submittal for maximum environmental temperature specifications).
  • Page 6: Electrical Installation

    2.2 Electrical Installation • AtmosAir FC400 series systems require approximately 4.5 watts. • Follow proper electrical procedures, guidelines, and codes for providing power to the systems, including requirements for conduit, sufficient ampacity, phase balancing, etc. Electrical installation should be performed by a qualified electrician.
  • Page 7: Maintenance Requirements

    The maintenance requirements on an AtmosAir system are mainly site-dependent; a heavily contaminated environment may require more frequent inspection & maintenance. Annual system maintenance is recommended. A Bi-annual tube replacement required. Your local AtmosAir dealer can provide you with an annual service contract.
  • Page 8: Troubleshooting

    Usually a failing tube can be determined in a darkened room by looking for a flash or arc from the failing tube. 9. If the fuse blows, then the system should be serviced by a qualified AtmosAir Technician. You can contact repair services at RMA@atmosair.com or by contacting us at 1-888-MY-AIR11.
  • Page 9: More Products

    AtmosAir’s unique and proven air purification process significantly reduces mold, controls the spread of bacteria and airborne viruses, and reduces airborne particles that evade normal filtration solutions.