Leroy-Somer GEARLESS Z2 Installation And Maintenance Manual
Leroy-Somer GEARLESS Z2 Installation And Maintenance Manual

Leroy-Somer GEARLESS Z2 Installation And Maintenance Manual

A.c. drive for elevators

Advertisement

3862 en - 07.2004 / a
GEARLESS Z2 - Z3
A.C. drive
for elevators
Installation and maintenance

Advertisement

Table of Contents
loading

Summary of Contents for Leroy-Somer GEARLESS Z2

  • Page 1 3862 en - 07.2004 / a GEARLESS Z2 - Z3 A.C. drive for elevators Installation and maintenance...
  • Page 2 3862 en - 07.2004 / a GEARLESS Z2 - Z3 A.C. Drive for elevators To ensure that the LEROY-SOMER motor you have just CAUTION: Check that the elevator car has been purchased is entirely satisfactory, it is essential to adhere to immobilised before performing any work on the the following instructions.
  • Page 3: Storage Location

    LEROY-SOMER INSTALLATION AND MAINTENANCE 3862 en - 07.2004 / a GEARLESS Z2 - Z3 A.C. Drive for elevators 2 - STORAGE 3 - ENVIRONMENT 2.1 - Storage location The rated characteristics are given for operation in a standard environment (see IEC 600034-5):...
  • Page 4: Before Installation

    LEROY-SOMER INSTALLATION AND MAINTENANCE 3862 en - 07.2004 / a GEARLESS Z2 - Z3 A.C. Drive for elevators 4 - COMMISSIONING 4.1 - INSTALLATION The installation must comply with the characteristics of the BEFORE INSTALLATION motor indicated on the nameplate (see section 1).
  • Page 5 LEROY-SOMER INSTALLATION AND MAINTENANCE 3862 en - 07.2004 / a GEARLESS Z2 - Z3 A.C. Drive for elevators 4.2 - Wiring Z2-Z3 Cast iron shield Anchoring points - See the connection diagrams below. Points d'ancrage pour levage approx: 2 m Fig.
  • Page 6: Maintenance & Servicing

    LEROY-SOMER INSTALLATION AND MAINTENANCE 3862 en - 07.2004 / a GEARLESS Z2 - Z3 A.C. Drive for elevators 5 - MAINTENANCE/SERVICING CAUTION: It is the responsibility of the user to connect the motor in accordance with the current legislation and regulations in the country of use. This is 5.1 - After one month’s operation...
  • Page 7 LEROY-SOMER INSTALLATION AND MAINTENANCE 3862 en - 07.2004 / a GEARLESS Z2 - Z3 A.C. Drive for elevators 6 - BRAKE ADJUSTMENT 6.3 - Checking the adjustment of the air gap (with the brakes energised) PROCEDURE 1 - Energise the brakes.
  • Page 8: Ordering Spare Parts

    LEROY-SOMER INSTALLATION AND MAINTENANCE 3862 en - 07.2004 / a GEARLESS Z2 - Z3 A.C. Drive for elevators 7 - ORDERING SPARE PARTS To ensure optimum after-sales service, the following information must be provided with each spare parts order: - type and serial number of the motor...
  • Page 9 LEROY-SOMER INSTALLATION AND MAINTENANCE 3862 en - 07.2004 / a GEARLESS Z2 - Z3 A.C. Drive for elevators...
  • Page 10 LEROY-SOMER INSTALLATION AND MAINTENANCE 3862 en - 07.2004 / a GEARLESS Z2 - Z3 A.C. Drive for elevators...
  • Page 12 LEROY-SOMER 16015 ANGOULÊME CEDEX - FRANCE RCS ANGOULÊME N° B 671 820 223 S.A. au capital de 62 779 000 www.leroy-somer.com...

This manual is also suitable for:

Gearless z3

Table of Contents