Preparing For Operation; Installing And Checking The Cells - LOMO Compact Automat Operation Manual

Table of Contents

Advertisement

Fig. 5.

5. PREPARING FOR OPERATION

5.1. Installing and Checking the Cells

To install the power source into the camera, move cover 16 (Fig. 4) in a direction pointed with an
«
»
«
»
arrow. Put the cells into the container so that sign
X
on the cells is looking towards sign
X
on
the camera container. Close the container cover. Watch attentively over correct setting of the cells.
10

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Compact Automat and is the answer not in the manual?

This manual is also suitable for:

Lc-a

Table of Contents